Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Charter Township of Northville
Removal of (2) existing block dugouts & installation of two (2) 10’ x 20’ T-cantilever shade system dugouts at Community Park field 5 and concrete pads for each dugout (2). The Township hereby solicits bids for the removal of (2) existing block dugouts & installation of two (2) 10’ x 20’ T-cantilever shade system dugouts at Community Park field 5 and concrete pads for each dugout (2).
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Shawnee Community College
Provide replacement of the existing dugouts and other improvements to the baseball field facilities. Work shall include selective and structure demolition, site and structural concrete, masonry walls, structural steel, wood framing, architectural metal roofing and drainage, hollow metal doors and frames, painting, baseball equipment, baseball backstop netting system, sitework, chain link fence and gates, warning track, and utility and electrical work commensurate to the project scope.
Posted Date
Nov 13, 2025
Due Date
Dec 5, 2025
Release: Nov 13, 2025
Shawnee Community College
Close: Dec 5, 2025
Provide replacement of the existing dugouts and other improvements to the baseball field facilities. Work shall include selective and structure demolition, site and structural concrete, masonry walls, structural steel, wood framing, architectural metal roofing and drainage, hollow metal doors and frames, painting, baseball equipment, baseball backstop netting system, sitework, chain link fence and gates, warning track, and utility and electrical work commensurate to the project scope.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Shawnee Community College
Provide replacement of the existing dugouts and other improvements to the baseball field facilities. Work shall include selective and structure demolition, site and structural concrete, masonry walls, structural steel, wood framing, architectural metal roofing and drainage, hollow metal doors and frames, painting, baseball equipment, baseball backstop netting system, sitework, chain link fence and gates, warning track, and utility and electrical work commensurate to the project scope.
Posted Date
Nov 13, 2025
Due Date
Dec 5, 2025
Release: Nov 13, 2025
Shawnee Community College
Close: Dec 5, 2025
Provide replacement of the existing dugouts and other improvements to the baseball field facilities. Work shall include selective and structure demolition, site and structural concrete, masonry walls, structural steel, wood framing, architectural metal roofing and drainage, hollow metal doors and frames, painting, baseball equipment, baseball backstop netting system, sitework, chain link fence and gates, warning track, and utility and electrical work commensurate to the project scope.
AvailableMount Desert Island High School
Track and field replacement.
Posted Date
Nov 6, 2025
Due Date
Dec 11, 2025
Release: Nov 6, 2025
Mount Desert Island High School
Close: Dec 11, 2025
Track and field replacement.
AvailableRockwood School District R-6
Project scope includes removal of existing, prep for, provide, and install new synthetic turf.
Posted Date
Nov 19, 2025
Due Date
Dec 16, 2025
Release: Nov 19, 2025
Rockwood School District R-6
Close: Dec 16, 2025
Project scope includes removal of existing, prep for, provide, and install new synthetic turf.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →