Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Request for proposals for construction services related to the Bartlett Bay Wastewater Treatment Facility Upgrade.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Sealed bid solicitation for full-site construction and demolition to upgrade the Bartlett Bay Wastewater Treatment Facility in South Burlington, VT. Scope includes new headworks, splitter box, secondary clarifier, replacement/refurbishment of clarifiers and aeration systems (diffusers, blowers, pumps, controls), filter replacement, chemical storage/feed building, precast post-tensioned solids handling tanks, UV building and controls, effluent heat/plant water building, main electrical service and room, new operations/maintenance building, sitework (culvert, stormwater, hardscapes), perimeter security fencing, and demolition of existing structures. Procurement is public bid via QuestCDN; procurement requirements include a 5% bid security, 100% performance and payment bonds, federal/state funding conditions (CWSRF) with Davis‑Bacon prevailing wages, DBE goals/compliance, American Iron & Steel and Build America Buy America (BABAA) requirements, and prohibition on certain telecom/video surveillance equipment.
Posted Date
Nov 12, 2025
Due Date
Jan 7, 2026
Release: Nov 12, 2025
Close: Jan 7, 2026
Sealed bid solicitation for full-site construction and demolition to upgrade the Bartlett Bay Wastewater Treatment Facility in South Burlington, VT. Scope includes new headworks, splitter box, secondary clarifier, replacement/refurbishment of clarifiers and aeration systems (diffusers, blowers, pumps, controls), filter replacement, chemical storage/feed building, precast post-tensioned solids handling tanks, UV building and controls, effluent heat/plant water building, main electrical service and room, new operations/maintenance building, sitework (culvert, stormwater, hardscapes), perimeter security fencing, and demolition of existing structures. Procurement is public bid via QuestCDN; procurement requirements include a 5% bid security, 100% performance and payment bonds, federal/state funding conditions (CWSRF) with Davis‑Bacon prevailing wages, DBE goals/compliance, American Iron & Steel and Build America Buy America (BABAA) requirements, and prohibition on certain telecom/video surveillance equipment.
AvailableConstruction and demolition including but not limited to the following generalized list. Please refer to bid documents for all work. a.New Headworks Building b.New Splitter Box c.New Secondary Clarifier d.Replacement of existing Clarifier Equipment including pumps. e.Replacement of Existing Aeration equipment including defuses, blowers, pumps and associated controls and piping. f.Refurbishment of Existing Aeration Tanks including; a new stair at the east tank, new guardrails and gates at the west tank. g.Replacement of Existing Filter system including 3 filters and associated controls.h.New Chemical Storage and Feed Building i.New Precast – Posttensioned Solids Handling Tanks j.New UV Building, including inclined UV banks and associated controls. k.New Effluent Heat and Plant Water Building for service of the facility with plant water and heating water l. New Main Electrical Room including new main underground service to the site. m.New Operations Building including maintenance garage, offices, showers, breakroom and laboratory. and perimeter Security Fencing. n.New Culvert, stormwater containment, roadway security fencing and hardscapes such as manholes and catch basins. o.Demolition of existing structures including: •Existing headworks and influent troughs •Operations Building •Clarigester & Control Building •Greenhouse •Storage Building including abandoned and partially buried circular clarifiers. •Steel Sludge Storage Tank.
Posted Date
Nov 12, 2025
Due Date
Jan 14, 2026
Release: Nov 12, 2025
Close: Jan 14, 2026
Construction and demolition including but not limited to the following generalized list. Please refer to bid documents for all work. a.New Headworks Building b.New Splitter Box c.New Secondary Clarifier d.Replacement of existing Clarifier Equipment including pumps. e.Replacement of Existing Aeration equipment including defuses, blowers, pumps and associated controls and piping. f.Refurbishment of Existing Aeration Tanks including; a new stair at the east tank, new guardrails and gates at the west tank. g.Replacement of Existing Filter system including 3 filters and associated controls.h.New Chemical Storage and Feed Building i.New Precast – Posttensioned Solids Handling Tanks j.New UV Building, including inclined UV banks and associated controls. k.New Effluent Heat and Plant Water Building for service of the facility with plant water and heating water l. New Main Electrical Room including new main underground service to the site. m.New Operations Building including maintenance garage, offices, showers, breakroom and laboratory. and perimeter Security Fencing. n.New Culvert, stormwater containment, roadway security fencing and hardscapes such as manholes and catch basins. o.Demolition of existing structures including: •Existing headworks and influent troughs •Operations Building •Clarigester & Control Building •Greenhouse •Storage Building including abandoned and partially buried circular clarifiers. •Steel Sludge Storage Tank.
AvailableProcuring proposals for the construction of Wastewater Treatment Facility Improvements, including mechanical bar screen replacement, new sprayfield pump station, and control building, with optional replacements for influent pumps, air release valves, and emergency diesel generator.
Posted Date
-
Due Date
Jan 22, 2026
Release: -
Close: Jan 22, 2026
Procuring proposals for the construction of Wastewater Treatment Facility Improvements, including mechanical bar screen replacement, new sprayfield pump station, and control building, with optional replacements for influent pumps, air release valves, and emergency diesel generator.
AvailableWastewater treatment facility (WWTF) expansion.
Posted Date
Oct 23, 2025
Due Date
Jan 8, 2026
Release: Oct 23, 2025
Close: Jan 8, 2026
Wastewater treatment facility (WWTF) expansion.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis