Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Parking lot restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes beach & parking lot restoration.
Posted Date
Jan 12, 2026
Due Date
Feb 20, 2026
Release: Jan 12, 2026
Close: Feb 20, 2026
Work includes beach & parking lot restoration.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes: Remove and replace approx 34,000 sf of gravel parking lot surface to an 8" depth; install concrete curbing, asphalt approaches at entrance and exit, and ADA compliant sidewalk; regrade site to improve drainage; jet-vac existing stormwater pipes and inlets.
Posted Date
Jan 14, 2026
Due Date
Feb 3, 2026
Release: Jan 14, 2026
Close: Feb 3, 2026
Work includes: Remove and replace approx 34,000 sf of gravel parking lot surface to an 8" depth; install concrete curbing, asphalt approaches at entrance and exit, and ADA compliant sidewalk; regrade site to improve drainage; jet-vac existing stormwater pipes and inlets.
AvailableHarper College is soliciting sealed bids for the 2026 LCC Parking Lot Restoration Phase II project, with bids due by 11:00 AM Central Time on February 16, 2026. The scope includes mobilization, site preparation, demolition, excavation, concrete foundation and flatwork, utility work, landscaping, and restoration, with plans/specifications available through the BHFX Planroom beginning January 15, 2026. A non-mandatory pre-bid meeting is scheduled for January 28, 2026 at 9:00 AM at the Harper College Learning and Career Center in Prospect Heights, Illinois.
Posted Date
Jan 14, 2026
Due Date
Feb 16, 2026
Release: Jan 14, 2026
Close: Feb 16, 2026
Harper College is soliciting sealed bids for the 2026 LCC Parking Lot Restoration Phase II project, with bids due by 11:00 AM Central Time on February 16, 2026. The scope includes mobilization, site preparation, demolition, excavation, concrete foundation and flatwork, utility work, landscaping, and restoration, with plans/specifications available through the BHFX Planroom beginning January 15, 2026. A non-mandatory pre-bid meeting is scheduled for January 28, 2026 at 9:00 AM at the Harper College Learning and Career Center in Prospect Heights, Illinois.
AvailableRelease: Jan 9, 2026
Close: Jan 27, 2026
Parking Lot Replacements.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →