City of Malad City
Reconstruction of approx 2,470-feet, including intersection tie-ins. Work includes removal of the existing bituminous surface, placement of granular subbase and base to bring to new grade, and repair of any unsuitable subgrade areas as encountered. Other items include adjustment of manhole covers and valve covers, installation of 12 storm sewer pipe, pavement markings, and concrete gutters.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Village of Botkins
The work for which proposals are invited consists of approx. 1,100 LF of street reconstruction to include curb, gutter, sidewalk, and drive approaches along with water line and storm drainage replacement.
Posted Date
Nov 1, 2025
Due Date
Nov 20, 2025
Release: Nov 1, 2025
Village of Botkins
Close: Nov 20, 2025
The work for which proposals are invited consists of approx. 1,100 LF of street reconstruction to include curb, gutter, sidewalk, and drive approaches along with water line and storm drainage replacement.
AvailableCity of Greenville
DODGE, JAMES AND GROVE STREET RECONSTRUCTION work. The Project includes removal and replacement of approx. 0.39 miles of existing road within the same footprint. Installation items include 1,972 LF of 8" sanitary sewer with 8 precast concrete manholes and castings; 451 LF of 12" Cl A storm sewer with 5 precast concrete manholes and covers; 2,066 LF of 8" ductile iron water main, 3 fire hydrants, 12 valves and associated fittings; replacement of 43 water service lines; 3,668 LF of concrete curb and gutter; 526 square yards of driveway; 1,336 square feet of concrete sidewalk; 5,556 square yards of aggregate base; 916 tons of HMA surfacing and 0.5 acres of restoration. The project also includes traffic control devices.
Posted Date
Nov 4, 2025
Due Date
Dec 9, 2025
Release: Nov 4, 2025
City of Greenville
Close: Dec 9, 2025
DODGE, JAMES AND GROVE STREET RECONSTRUCTION work. The Project includes removal and replacement of approx. 0.39 miles of existing road within the same footprint. Installation items include 1,972 LF of 8" sanitary sewer with 8 precast concrete manholes and castings; 451 LF of 12" Cl A storm sewer with 5 precast concrete manholes and covers; 2,066 LF of 8" ductile iron water main, 3 fire hydrants, 12 valves and associated fittings; replacement of 43 water service lines; 3,668 LF of concrete curb and gutter; 526 square yards of driveway; 1,336 square feet of concrete sidewalk; 5,556 square yards of aggregate base; 916 tons of HMA surfacing and 0.5 acres of restoration. The project also includes traffic control devices.
AvailableMassachusetts Department of Transportation
Road reconstruction.
Posted Date
Sep 13, 2025
Due Date
Nov 25, 2025
Release: Sep 13, 2025
Massachusetts Department of Transportation
Close: Nov 25, 2025
Road reconstruction.
AvailableCity of Creston
Excavation, Class 10 - 570 CY; Subgrade Preparation (12β Thick) - 2,846 SY; Granular Subbase, Modified Subbase, 6β Thick - 2,846 SY, Compaction Testing - 1 LS; Trench Compaction Testing - 1 LS; Storm Sewer, Trenched, 15β - 106 LF; Pipe Culvert, Trenched, 18β - 35 LF; Removal of Storm Sewer.
Posted Date
Nov 5, 2025
Due Date
Dec 10, 2025
Release: Nov 5, 2025
City of Creston
Close: Dec 10, 2025
Excavation, Class 10 - 570 CY; Subgrade Preparation (12β Thick) - 2,846 SY; Granular Subbase, Modified Subbase, 6β Thick - 2,846 SY, Compaction Testing - 1 LS; Trench Compaction Testing - 1 LS; Storm Sewer, Trenched, 15β - 106 LF; Pipe Culvert, Trenched, 18β - 35 LF; Removal of Storm Sewer.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis