Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Bailey street sewer replacement project consists of the replacement of approx. 1,275 LF of existing 6" vitrified clay sewer main with new 8" diameter polyvinyl chloride (PVC) sewer pipeline at various locations. The scope of work also includes removing existing manholes and replacing them with new concrete manholes at multiple locations, removing an existing 8" sewer bypass, connecting the existing sewer main on Hill Avenue to the new manhole on Bailey Street, and connecting the new sewer main to the existing manhole on Painter Avenue.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Howard street generator replacement project. Bid Group #1, Bid Package #1 - Electrical.
Posted Date
Dec 17, 2025
Due Date
Jan 8, 2026
Release: Dec 17, 2025
Close: Jan 8, 2026
Howard street generator replacement project. Bid Group #1, Bid Package #1 - Electrical.
AvailableProject consists of sewer line replacement.
Posted Date
Dec 12, 2025
Due Date
Jan 13, 2026
Release: Dec 12, 2025
Close: Jan 13, 2026
Project consists of sewer line replacement.
AvailableSewer replacement work on Central Street that includes the replacement of ductile iron water mains; replacement of vitrified clay sewer pipes; replacement of water services and sewer laterals from the main to the back of sidewalk; replacement of hydrants, butterfly valves, and all other applicable water and sewer appurtenant work.
Posted Date
Nov 20, 2025
Due Date
Dec 23, 2025
Release: Nov 20, 2025
Close: Dec 23, 2025
Sewer replacement work on Central Street that includes the replacement of ductile iron water mains; replacement of vitrified clay sewer pipes; replacement of water services and sewer laterals from the main to the back of sidewalk; replacement of hydrants, butterfly valves, and all other applicable water and sewer appurtenant work.
AvailableSewer replacement work on Central Street that includes the replacement of ductile iron water mains; replacement of vitrified clay sewer pipes; replacement of water services and sewer laterals from the main to the back of sidewalk; replacement of hydrants, butterfly valves, and all other applicable water and sewer appurtenant work.
Posted Date
Nov 20, 2025
Due Date
Dec 23, 2025
Release: Nov 20, 2025
Close: Dec 23, 2025
Sewer replacement work on Central Street that includes the replacement of ductile iron water mains; replacement of vitrified clay sewer pipes; replacement of water services and sewer laterals from the main to the back of sidewalk; replacement of hydrants, butterfly valves, and all other applicable water and sewer appurtenant work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis