Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Bailey flat bridge replacement plus other incidental work - 1 EA removing single tree top only; 1 ea removing stump; 90 SY removing pavement surface; 1,375 CY common excavation; 110 T disposal of special waste; 520 CY granular borrow; 180 CY special fill; 120 CY culvert bedding stone; 920 CY structural earth excavation - drainage and minor structures, below grade; 1,150 CY aggregate subbase course - gravel; 170 T hot mix asphalt 12.5 MM HMA surface; 11 T hot mix asphalt 9.5 MM (sidewalks, drives, incidentals); 260 T hot mix asphalt 12.5 MM base; 60 G bituminous tack coat - applied; sheet waterproofing membrane; cofferdam: downstream/upstream; protective coating for concrete surfaces; portable concrete barrier type I; precast concrete box culvert; 425 LF 31" W-BM GR, MID-WAY splice-SGL faced; 25 LF 31" W-BM GR, MID-WAY splice-over 15' RAD; 3 EA 31" W-BM GR, MID-WAY splice flared terminal; 1 EA terminal end - single rail-galvanized steel; 7 EA reflectorized flexible guardrail marker; 1 EA single wood post; 50 LF guardrail - single rail culvert mounted; 470 CY plain riprap; 250 SY erosion control blanket; 70 CY loam; 12 UN seeding method number 2; 12 UN mulch; 140 CY erosion control mix; 6920 SY erosion control geotextile; 255 SY separation geotextile; 235 SY reinforcement geogrid; 1,350 LF 4" white or yellow painted pavement marking line; 40 HR hand labor, straight time; 40 HR all purpose excvavator (including operator); 40 HR truck - large (including operator); 10 HR chain saw rental (including operator); field office type B; 8 EA type III barricade; 25 EA drum; 25 EA cone; 520 SF construction signs; maintenance of traffic control devices; 150 HR flagger; temporary soil erosion and water pollution control; mobilization (10% or less).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replacement of Bridge
Posted Date
-
Due Date
Feb 2, 2026
Release: -
Close: Feb 2, 2026
Replacement of Bridge
AvailableBridge deck replacement.
Posted Date
-
Due Date
Jan 8, 2026
Release: -
Close: Jan 8, 2026
Bridge deck replacement.
AvailableBridge replacement - precast reinforced concrete 3-sided structure.
Posted Date
Nov 17, 2025
Due Date
Jan 14, 2026
Release: Nov 17, 2025
Close: Jan 14, 2026
Bridge replacement - precast reinforced concrete 3-sided structure.
AvailableRelease: Dec 9, 2025
Close: Jan 6, 2026
Work includes bridge replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis