Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Roof and HVAC repair.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Naval Facilities Engineering Command issued Solicitation N4008526R0029 for a fixed-price construction contract to repair and restore Building 300 at Portsmouth Naval Shipyard in Kittery, Maine. The project involves the full replacement of the existing roof with a new TPO membrane and the complete overhaul of the HVAC systems, including the removal of hazardous RCRA 8 metals and asbestos. Additional work includes the installation of a new steam-to-hot-water plant, fire alarm and sprinkler system replacements, and major electrical utility upgrades.
Posted Date
Jan 28, 2026
Due Date
Mar 2, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Mar 2, 2026
The Naval Facilities Engineering Command issued Solicitation N4008526R0029 for a fixed-price construction contract to repair and restore Building 300 at Portsmouth Naval Shipyard in Kittery, Maine. The project involves the full replacement of the existing roof with a new TPO membrane and the complete overhaul of the HVAC systems, including the removal of hazardous RCRA 8 metals and asbestos. Additional work includes the installation of a new steam-to-hot-water plant, fire alarm and sprinkler system replacements, and major electrical utility upgrades.
AvailableThe Department of the Navy (Naval Facilities Engineering Command) is seeking contractors for comprehensive structural repairs to Berth 13 at Portsmouth Naval Shipyard in Kittery, ME. This procurement, estimated between $25M-$100M, involves demolition, concrete deck repairs, pile and beam repairs, and steel reaction frame connections, with completion required within approximately 700 calendar days. The RFP is scheduled for issuance on January 22, 2026, with an anticipated award date of April 13, 2026.
Posted Date
Jan 22, 2026
Due Date
Apr 13, 2026
Release: Jan 22, 2026
Close: Apr 13, 2026
The Department of the Navy (Naval Facilities Engineering Command) is seeking contractors for comprehensive structural repairs to Berth 13 at Portsmouth Naval Shipyard in Kittery, ME. This procurement, estimated between $25M-$100M, involves demolition, concrete deck repairs, pile and beam repairs, and steel reaction frame connections, with completion required within approximately 700 calendar days. The RFP is scheduled for issuance on January 22, 2026, with an anticipated award date of April 13, 2026.
AvailableNAVFAC Atlantic (Department of the Navy) issued Solicitation N6247026R0016 for structural repairs to Berth 13 at Portsmouth Naval Shipyard to restore deck loading capacity and repair deteriorated deck sections, piles, caps, beams, and steel reaction frame connections. The unrestricted construction solicitation (NAICS 237990; PSC Z2ED) requires marine-capable repairs (work from barges/floating platforms) and strict debris-control measures; some attachments (e.g., Attch J - Specs, DWGs & RPTs) must be requested via email to the contract specialist. Proposals are due Mar 6, 2026 at 2:00 PM EST and the contracting office is NAVFACSYSCOM Atlantic (contracting address: 6506 Hampton Blvd, Norfolk, VA 23508).
Posted Date
Jan 24, 2026
Due Date
Mar 6, 2026
Release: Jan 24, 2026
Close: Mar 6, 2026
NAVFAC Atlantic (Department of the Navy) issued Solicitation N6247026R0016 for structural repairs to Berth 13 at Portsmouth Naval Shipyard to restore deck loading capacity and repair deteriorated deck sections, piles, caps, beams, and steel reaction frame connections. The unrestricted construction solicitation (NAICS 237990; PSC Z2ED) requires marine-capable repairs (work from barges/floating platforms) and strict debris-control measures; some attachments (e.g., Attch J - Specs, DWGs & RPTs) must be requested via email to the contract specialist. Proposals are due Mar 6, 2026 at 2:00 PM EST and the contracting office is NAVFACSYSCOM Atlantic (contracting address: 6506 Hampton Blvd, Norfolk, VA 23508).
AvailableProject consists of structural upgrades and repairs and upgrading life safety, egress, and accessibility components in the building to meet current code requirements. The project includes providing an elevator, adding building wide sprinkler system, and fire alarm system. Hazardous materials abatement, structural replacement/repairs, power distribution and system upgrades, building envelope repairs, interior space renovations, utility upgrades, and incidental related work. Phasing and coordination with shipyard operations is paramount and mission critical elements need to remain fully operational throughout the duration of the project. Building 60 is an historic facility and requires special coordination to have limited impact on the historic fabric and character defining features of the structure.
Posted Date
Jan 10, 2026
Due Date
Feb 25, 2026
Release: Jan 10, 2026
Close: Feb 25, 2026
Project consists of structural upgrades and repairs and upgrading life safety, egress, and accessibility components in the building to meet current code requirements. The project includes providing an elevator, adding building wide sprinkler system, and fire alarm system. Hazardous materials abatement, structural replacement/repairs, power distribution and system upgrades, building envelope repairs, interior space renovations, utility upgrades, and incidental related work. Phasing and coordination with shipyard operations is paramount and mission critical elements need to remain fully operational throughout the duration of the project. Building 60 is an historic facility and requires special coordination to have limited impact on the historic fabric and character defining features of the structure.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →