Summary
Install new BODA 3P automatic transfer switchp provide stamped, engineered drawings; excavation and bollard installation; provide remote annunciator installation; provide temporary generator for cutover; install new feeder conduit and wiring between generator and electrical service equipment; core drill for 4" EMT conduit penetrations; install 600MCM copper feeder conductors; tnstall 1/0 grounding conductors; install 1" EMT control conduit; modify existing pull box for new feeder routing; firestop all new penetrations; provide scheduled system shutdown coordination; perform ATS system switchover to new equipment; complete startup, load testing and commissioning of emergency power system; install, position, and place the temporary generator upon delivery; perform connection readiness, securing, and general setup required for safe operation.