Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Indiana Department of Transportation
Bridge deck replacement. Work includes clearing right of way; 260 CY of common excavation; stormwater management; 1,365 SY of transition milling; 113 LF of 6'3" spacing MGS W-beam guardrail; 39 SY of sodding; 1 LS surface seal; 126 SF of patching concrete structures; signage; pavement markings. See attached files.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Indiana Department of Transportation
Bridge deck overlay and thin deck overlay. Work includes 1 LS clearing right of way; stormwater management; 1,162 SY of transition milling; 885 LF of joint adhesive; 13 LF of 6'3" spacing MGS W-beam guardrail; 50 SF of concrete structures patching; 368 SY of rigid bridge deck overlay; 368 SY of hydro demolition; pavement markings. See attached files for complete scope of work.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
Bridge deck overlay and thin deck overlay. Work includes 1 LS clearing right of way; stormwater management; 1,162 SY of transition milling; 885 LF of joint adhesive; 13 LF of 6'3" spacing MGS W-beam guardrail; 50 SF of concrete structures patching; 368 SY of rigid bridge deck overlay; 368 SY of hydro demolition; pavement markings. See attached files for complete scope of work.
AvailableIndiana Department of Transportation
Bridge thin deck overlay. Work includes 100 LF of PCC sealer/healer RCBA crack filling; 68 SF of partial depth bridge deck patching; signage; pavement markings. See attached files.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
Bridge thin deck overlay. Work includes 100 LF of PCC sealer/healer RCBA crack filling; 68 SF of partial depth bridge deck patching; signage; pavement markings. See attached files.
AvailableTown of Townshend
Replacement of the bridge deck, superstructure, bridge rail and bridge approach railing, and adding riprap for scour protection around the abutments. The existing structure is 65' long. Construction will be in accordance with the design plans available upon request. The town is requiring the beams to be hot-dip galvanized steel beams.
Posted Date
Nov 10, 2025
Due Date
Dec 9, 2025
Release: Nov 10, 2025
Town of Townshend
Close: Dec 9, 2025
Replacement of the bridge deck, superstructure, bridge rail and bridge approach railing, and adding riprap for scour protection around the abutments. The existing structure is 65' long. Construction will be in accordance with the design plans available upon request. The town is requiring the beams to be hot-dip galvanized steel beams.
AvailableIndiana Department of Transportation
Bridge deck overlay. Work includes clearing right of way; 252 LF of pipe abandon and grout fill; 600 CY of common excavation; 200 LF of linear grading; stromwater management; 2,192 SY of scarification milling; 5,776 SY of transition milling; 8,280 LF of joint adhesive; 12,336 SY of asphalt for tack coat; surface seal; 1,706 SY of rigid bridge deck overlay; 100 LF of 15" trenchless pipe installation; signage; pavement markings. See attached files.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
Bridge deck overlay. Work includes clearing right of way; 252 LF of pipe abandon and grout fill; 600 CY of common excavation; 200 LF of linear grading; stromwater management; 2,192 SY of scarification milling; 5,776 SY of transition milling; 8,280 LF of joint adhesive; 12,336 SY of asphalt for tack coat; surface seal; 1,706 SY of rigid bridge deck overlay; 100 LF of 15" trenchless pipe installation; signage; pavement markings. See attached files.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis