Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Townshend
Replacement of the bridge deck, superstructure, bridge rail and bridge approach railing, and adding riprap for scour protection around the abutments. The existing structure is 65' long. Construction will be in accordance with the design plans available upon request. The town is requiring the beams to be hot-dip galvanized steel beams.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Lee County
Bridge replacement.
Posted Date
Nov 14, 2025
Due Date
Dec 15, 2025
Release: Nov 14, 2025
Lee County
Close: Dec 15, 2025
Bridge replacement.
AvailableIndiana Department of Transportation
Bridge deck replacement. Work includes clearing right of way; 260 CY of common excavation; stormwater management; 1,365 SY of transition milling; 113 LF of 6'3" spacing MGS W-beam guardrail; 39 SY of sodding; 1 LS surface seal; 126 SF of patching concrete structures; signage; pavement markings. See attached files.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
Bridge deck replacement. Work includes clearing right of way; 260 CY of common excavation; stormwater management; 1,365 SY of transition milling; 113 LF of 6'3" spacing MGS W-beam guardrail; 39 SY of sodding; 1 LS surface seal; 126 SF of patching concrete structures; signage; pavement markings. See attached files.
AvailableNew York State Department of Transportation
Bridge deck replacement.
Posted Date
Oct 16, 2025
Due Date
Nov 20, 2025
Release: Oct 16, 2025
New York State Department of Transportation
Close: Nov 20, 2025
Bridge deck replacement.
Union County
The project involves replacing an existing bridge about 300 FT east of the intersection. We understand that the new bridge will have a single 50-FT span and a width of 12Β½ FT. The superstructure will consist of steel beams with a cast-in-place reinforced concrete deck. 1 LS removal of existing structure, 35.2 SY sawcut and remove existing asphalt, 74 CY concrete bridge decking, erosion control.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Union County
Close: Dec 10, 2025
The project involves replacing an existing bridge about 300 FT east of the intersection. We understand that the new bridge will have a single 50-FT span and a width of 12Β½ FT. The superstructure will consist of steel beams with a cast-in-place reinforced concrete deck. 1 LS removal of existing structure, 35.2 SY sawcut and remove existing asphalt, 74 CY concrete bridge decking, erosion control.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis