Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Indiana Department of Transportation
Bridge deck overlay. Work includes clearing right of way; 252 LF of pipe abandon and grout fill; 600 CY of common excavation; 200 LF of linear grading; stromwater management; 2,192 SY of scarification milling; 5,776 SY of transition milling; 8,280 LF of joint adhesive; 12,336 SY of asphalt for tack coat; surface seal; 1,706 SY of rigid bridge deck overlay; 100 LF of 15" trenchless pipe installation; signage; pavement markings. See attached files.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Indiana Department of Transportation
Bridge deck overlay and thin deck overlay. Work includes 1 LS clearing right of way; stormwater management; 1,162 SY of transition milling; 885 LF of joint adhesive; 13 LF of 6'3" spacing MGS W-beam guardrail; 50 SF of concrete structures patching; 368 SY of rigid bridge deck overlay; 368 SY of hydro demolition; pavement markings. See attached files for complete scope of work.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
Bridge deck overlay and thin deck overlay. Work includes 1 LS clearing right of way; stormwater management; 1,162 SY of transition milling; 885 LF of joint adhesive; 13 LF of 6'3" spacing MGS W-beam guardrail; 50 SF of concrete structures patching; 368 SY of rigid bridge deck overlay; 368 SY of hydro demolition; pavement markings. See attached files for complete scope of work.
AvailableIndiana Department of Transportation
Bridge thin deck overlay. Work includes 100 LF of PCC sealer/healer RCBA crack filling; 68 SF of partial depth bridge deck patching; signage; pavement markings. See attached files.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
Bridge thin deck overlay. Work includes 100 LF of PCC sealer/healer RCBA crack filling; 68 SF of partial depth bridge deck patching; signage; pavement markings. See attached files.
AvailableIndiana Department of Transportation
Approx. 60 CY Excavation, common; 800 SY milling, transition; 1,845 SY asphalt for tack coat; 180 LF guardrail, mgs w-beam, 6 ft 3 in. Spacing; 58 SY sodding; 2.20 CY concrete, C, superstructure; 415 SF bridge deck patching, full depth; 920 SY bridge deck overlay, latex modified; 100 SF bridge deck patching, partial depth. See attache file.
Posted Date
Oct 15, 2025
Due Date
Dec 10, 2025
Release: Oct 15, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
Approx. 60 CY Excavation, common; 800 SY milling, transition; 1,845 SY asphalt for tack coat; 180 LF guardrail, mgs w-beam, 6 ft 3 in. Spacing; 58 SY sodding; 2.20 CY concrete, C, superstructure; 415 SF bridge deck patching, full depth; 920 SY bridge deck overlay, latex modified; 100 SF bridge deck patching, partial depth. See attache file.
AvailableIndiana Department of Transportation
Bridge thin deck overlay. Work includes stormwater management; 375 LF of filled joints in PCCP; 150 LF of reset guardrail; 672 SY of erosion control blanket; surface seal; 49 SF of partial depth bridge deck patching; pavement markings. See attached files for complete scope of work.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
Bridge thin deck overlay. Work includes stormwater management; 375 LF of filled joints in PCCP; 150 LF of reset guardrail; 672 SY of erosion control blanket; surface seal; 49 SF of partial depth bridge deck patching; pavement markings. See attached files for complete scope of work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis