Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes demolish and dispose of existing flooring materials - carpet; demolish and dispose of existing tack panel wall system; recess all surface mounted raceway, conduits, and outlets behind tack panel wall system; related cabling to be reinstalled behind tack panel wall system; remove and salvage white boards for reinstallation; if so equipped, remove and reinstall viewsonic mounts and monitors; remove and salvage fire extinguisher brackets for reinstallation; remove and replace all 1-gang outlets and related covers; remove and replace all other junction box, phones, and/or data drop cover plates; etc, see attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Refresh of restrooms to create cleaner, safer, and more welcoming environments for students. Refresh to include, but not limited to replacing wall finishes, plumbing fixtures, electrical fixtures, flooring and painting.
Posted Date
Dec 9, 2025
Due Date
Feb 13, 2026
Release: Dec 9, 2025
Close: Feb 13, 2026
Refresh of restrooms to create cleaner, safer, and more welcoming environments for students. Refresh to include, but not limited to replacing wall finishes, plumbing fixtures, electrical fixtures, flooring and painting.
AvailableThe solicitation requests a contractor to remove existing landscaping and furnish and install a poured-in-place rubber playground surface, swings, shade sails, fencing, and perform various landscape repairs at Ayala Park. The surfacing must meet ASTM F1292 impact attenuation standards and the contractor must provide a 5-year warranty and maintenance instructions; prevailing wage and contract conditions apply. The solicitation includes a mandatory pre-bid meeting on 2025-12-17 and procurement documents (Section A–H PDFs) available from the San Bernardino County eProcurement posting.
Posted Date
Dec 9, 2025
Due Date
Jan 8, 2026
Release: Dec 9, 2025
Close: Jan 8, 2026
The solicitation requests a contractor to remove existing landscaping and furnish and install a poured-in-place rubber playground surface, swings, shade sails, fencing, and perform various landscape repairs at Ayala Park. The surfacing must meet ASTM F1292 impact attenuation standards and the contractor must provide a 5-year warranty and maintenance instructions; prevailing wage and contract conditions apply. The solicitation includes a mandatory pre-bid meeting on 2025-12-17 and procurement documents (Section A–H PDFs) available from the San Bernardino County eProcurement posting.
Cabling Refresh Project.
Posted Date
Dec 5, 2025
Due Date
Jan 9, 2026
Release: Dec 5, 2025
Close: Jan 9, 2026
Cabling Refresh Project.
AvailableCabling Refresh Project.
Posted Date
Dec 5, 2025
Due Date
Jan 9, 2026
Release: Dec 5, 2025
Close: Jan 9, 2026
Cabling Refresh Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis