Summary
Project consists of the removal and replacement of the existing automated weather observing system (awos-iii) and installation of a new airport rotating beacon, Temporary Air and Water Pollution, Soil Erosion, and Siltation Control, BEACON: New tip-down beacon tower and foundation, complete in place. Includes tower, concrete foundation. Includes trench in unpaved areas for conduit and counterpoise, 2" HDPE conduits installed by directional boring, ground rods with connector, #6 Bare Solid AWG Counterpoise, 3 Wire #8 THWN Copper (Insulated), conductor installed in trench, electrical handholds, duct markers, sod restoration, coordination, labor, etc., complete in place.