Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for brick repointing and window replacement at the Averitt Center, and elastomeric wall coating at 33 East Vine.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes exterior masonry wall repointing and repair of the west wall at the jefferson theatre.
Posted Date
Dec 2, 2025
Due Date
Jan 29, 2026
Release: Dec 2, 2025
Close: Jan 29, 2026
Work includes exterior masonry wall repointing and repair of the west wall at the jefferson theatre.
AvailableWork generally consists to rehabilitate the interior (wet) coating system includes removing the entire existing interior (wet) coating system with sandblasting; applying a new interior (wet) two (2) coating system consisting of one (1) coat zinc primer and one (1) coat epoxy; rehabilitation or replacement of steel in areas of corrosion; replacement of the existing drain valve in the bottom of the tank bowl, removal of the interior ladder in its entirety; install (weld anchors for future impressed cathodic protection),
Posted Date
Jan 21, 2026
Due Date
Feb 17, 2026
Release: Jan 21, 2026
Close: Feb 17, 2026
Work generally consists to rehabilitate the interior (wet) coating system includes removing the entire existing interior (wet) coating system with sandblasting; applying a new interior (wet) two (2) coating system consisting of one (1) coat zinc primer and one (1) coat epoxy; rehabilitation or replacement of steel in areas of corrosion; replacement of the existing drain valve in the bottom of the tank bowl, removal of the interior ladder in its entirety; install (weld anchors for future impressed cathodic protection),
AvailableProvide speight building roof, window, & envelope replacement sco.
Posted Date
Jan 1, 2026
Due Date
Feb 5, 2026
Release: Jan 1, 2026
Close: Feb 5, 2026
Provide speight building roof, window, & envelope replacement sco.
AvailableThe Town of Juno Beach is seeking qualified contractors for the removal and replacement of sidewalk brick paver sections at various locations on US-1, according to Town standards.
Posted Date
Jan 7, 2026
Due Date
Feb 6, 2026
Release: Jan 7, 2026
Close: Feb 6, 2026
The Town of Juno Beach is seeking qualified contractors for the removal and replacement of sidewalk brick paver sections at various locations on US-1, according to Town standards.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →