Summary
Base Bid: Primary Work: Mobilization, Construction Safety Phasing Plan, Temporary Phasing Work, Electrical, Demolition Work, Electrical, AWOS III-P System, Complete and Commissioned, GA Terminal/SRE Building Work, Electrical, Complete, Vault Building Work, Electrical, Complete, 5200 Ft of 1/C No. 2 Cu AWG, 600V, THWN-2, Installed in Conduit, 200 Ft of 1/C No. 10 Cu AWG, 600V, THWN-2, Installed in Conduit, 2600 Ft of 1/C No. 6 Cu AWG, 600V (GND), THWN-2, Installed in Conduit, 100 Ft of 1/C No. 12 Cu AWG, 600V (GND), THWN-2, Installed in Conduit, Remove & Dispose of Existing Cable, Remove & Dispose of Existing Conduit & Cable, 90 Ft of Trenching & Backfilling or Plowing for Conduit, 90 Ft of Non-Encased, Electrical Conduit, 1-2 Inch, Type I, Sch. 40 PVC in Trench or SDR 13 HDPE Plowed, 9 Each of Cable Markers, 2 Each of L-867B (12”), Class 1A, Junction Box with Flat Etched Steel Cover, and other items of related construction.