Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work to fall into three categories: Mechanical/HVAC - Remove and replace four existing roof top mechanical units to accommodate upcoming future tenant improvements; fire access ladder - furnish and install an enclosed exterior roof access ladder to provide roof accessibility for both Valley Regional Fire Authority and building maintenance; and sewer - rehabilitate existing sewer service lines that are running directly under existing concrete building slab-on-grade including both relining and replacement of existing sewer piping and removal and replacement of existing concrete slab-on-grade.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project concludes updates to the educational resource center.
Posted Date
-
Due Date
Dec 26, 2025
Release: -
Close: Dec 26, 2025
Project concludes updates to the educational resource center.
AvailableProvide pump station 2 variable frequency drives (VFDs) upgrade at the water resource recovery facility, project includes replacement of sewage pump VFDs, rewinding of sewage pump motors, and electrical distribution system upgrades.
Posted Date
Jul 16, 2025
Due Date
Dec 12, 2025
Release: Jul 16, 2025
Close: Dec 12, 2025
Provide pump station 2 variable frequency drives (VFDs) upgrade at the water resource recovery facility, project includes replacement of sewage pump VFDs, rewinding of sewage pump motors, and electrical distribution system upgrades.
Requesting an Arc Flash Study for employee Safety and correct PPE (Personal Protective Equipment). Contractor will provide an Arc Flash Hazard Analysis study in accordance with NFPA 70E Standards for electrical safety in the work place and IEEE Standard 1584-Electrical guide to performing Arc Flash Hazard Calculations.
Posted Date
Jan 30, 2025
Due Date
Feb 10, 2027
Release: Jan 30, 2025
Close: Feb 10, 2027
Requesting an Arc Flash Study for employee Safety and correct PPE (Personal Protective Equipment). Contractor will provide an Arc Flash Hazard Analysis study in accordance with NFPA 70E Standards for electrical safety in the work place and IEEE Standard 1584-Electrical guide to performing Arc Flash Hazard Calculations.
Fabricate and install all necessary signage family resource center.
Posted Date
Nov 21, 2025
Due Date
Dec 15, 2025
Release: Nov 21, 2025
Close: Dec 15, 2025
Fabricate and install all necessary signage family resource center.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis