Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Ohio Bureau of Workers’ Compensation (Facilities) is soliciting engineering and consulting services to upgrade the generator control systems for three Cummins 1MW generators and to replace the building automatic transfer switch (ATS) in the William Green Building, Columbus, OH. Work includes site assessment, design/engineering for Basler DECS-150 digital excitation controls, ATS replacement, procurement/specification support, construction support, and testing/commissioning, with deliverables including as-built drawings and training. The solicitation was posted 2026-01-16 and has a mandatory site visit on 2026-01-22; proposals are due 2026-02-12 at 2:00 PM ET.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work include upgrade the generator control system for three existing Cummins 1MW (1000kW) generators and replace the existing automatic transfer switch (ATS) to improve system reliability, performance, and compliance with current standards.
Posted Date
Jan 16, 2026
Due Date
Feb 12, 2026
Release: Jan 16, 2026
Close: Feb 12, 2026
Work include upgrade the generator control system for three existing Cummins 1MW (1000kW) generators and replace the existing automatic transfer switch (ATS) to improve system reliability, performance, and compliance with current standards.
AvailableConstruction of a new emergency backup generator and transfer swtich installation at two (2) plants. The installation of a new diesel-fuel generator with a sound-attenuating enclosure, the concrete generator pad, generator platform, and grading of the existing site. The installation of a new ATS. The installation of a load bank for the generator
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
Construction of a new emergency backup generator and transfer swtich installation at two (2) plants. The installation of a new diesel-fuel generator with a sound-attenuating enclosure, the concrete generator pad, generator platform, and grading of the existing site. The installation of a new ATS. The installation of a load bank for the generator
AvailableThis RFP is for the installation of new diesel-fueled generators and automatic transfer switches (ATS) at Plant 3 and Plant 8, including all associated electrical and site improvements.
Posted Date
Dec 30, 2025
Due Date
Jan 27, 2026
Release: Dec 30, 2025
Close: Jan 27, 2026
This RFP is for the installation of new diesel-fueled generators and automatic transfer switches (ATS) at Plant 3 and Plant 8, including all associated electrical and site improvements.
AvailableWork includes demolition of diesel generator and fiberglass air piping, installation of standby diesel generator, installation of aeration control valves, installation of plant-wide fiber optic communication infrastructure for SCADA system.
Posted Date
Jan 12, 2026
Due Date
Feb 11, 2026
Release: Jan 12, 2026
Close: Feb 11, 2026
Work includes demolition of diesel generator and fiberglass air piping, installation of standby diesel generator, installation of aeration control valves, installation of plant-wide fiber optic communication infrastructure for SCADA system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis