Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Request for bids for Asphalt Surface Treatment in Lee and Moore counties.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes unclassified excavation, class iv subgrade stabilization, aggregate base course, sub-ballast, erosion control stone, rip rap, class, asphalt concrete base course, type, asphalt concrete intermediate course, type, asphalt concrete surface course, open-graded asphalt friction course, permeable asphalt drainage course, sand asphalt surface course, ultra-thin bonded wearing course, aggregate for cement treated base course, portland cement for cement treated base course, 11" portland cement concrete pavement, concrete shoulders adjacent to > 11" pavement. See attached file.
Posted Date
Jan 15, 2026
Due Date
Feb 10, 2026
Release: Jan 15, 2026
Close: Feb 10, 2026
Work includes unclassified excavation, class iv subgrade stabilization, aggregate base course, sub-ballast, erosion control stone, rip rap, class, asphalt concrete base course, type, asphalt concrete intermediate course, type, asphalt concrete surface course, open-graded asphalt friction course, permeable asphalt drainage course, sand asphalt surface course, ultra-thin bonded wearing course, aggregate for cement treated base course, portland cement for cement treated base course, 11" portland cement concrete pavement, concrete shoulders adjacent to > 11" pavement. See attached file.
AvailableWork includes 56,920 SY high friction surface treatment; 2,178 SY micromilling; 42,527 LF temporary pavement marking - paint 6"; 1,440 hr flagger.
Posted Date
Dec 18, 2025
Due Date
Feb 3, 2026
Release: Dec 18, 2025
Close: Feb 3, 2026
Work includes 56,920 SY high friction surface treatment; 2,178 SY micromilling; 42,527 LF temporary pavement marking - paint 6"; 1,440 hr flagger.
0.22 mi of hot mix asphalt reconstruction, high friction surface treatment, drainage improvements, signing and pavement markings. See attached file.
Posted Date
Jan 2, 2026
Due Date
Feb 6, 2026
Release: Jan 2, 2026
Close: Feb 6, 2026
0.22 mi of hot mix asphalt reconstruction, high friction surface treatment, drainage improvements, signing and pavement markings. See attached file.
AvailableThe paver placed surface treatment system shall consist of a warm polymer modified emulsion sprayed immediately preceding the application of a hot mix asphalt wearing course which forms a homogeneous well-textured and wearing surface that can be opened to traffic immediately on cooling. The normal thickness of the layer shall be 5/8"; the maximum thickness of the mat shall not exceed 1 1/2".
Posted Date
Jan 30, 2026
Due Date
Feb 26, 2026
Release: Jan 30, 2026
Close: Feb 26, 2026
The paver placed surface treatment system shall consist of a warm polymer modified emulsion sprayed immediately preceding the application of a hot mix asphalt wearing course which forms a homogeneous well-textured and wearing surface that can be opened to traffic immediately on cooling. The normal thickness of the layer shall be 5/8"; the maximum thickness of the mat shall not exceed 1 1/2".
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →