Summary
Work includes asphalt street rehabilitation. Edge milling 50,826 lin. ft.; butt joint 457 lin. ft.; tack coat 127,374 sq. yds.; wedge layer 53,768 sq. Yds.; 2" asphalt overlay 73,606 sq. yds. Mill approximately 1,461 lf variable depth of 2 to 0 inches. Grind two (2) butt joints at approximately 55 lf. Apply a pg64-22 tack coat at a rate of 0.15 gallons per square yard and provide a 2" overlay of type "c" bituminous pavement with fiber. Mill approximately 2,124 lf variable depth of 2 to 0 inches. Grind one (1) butt joint at approximately 52 lf. Apply a pg64-22 tack coat at a rate of 0.15 gallons per square yard and provide a 2" overlay of type "c" bituminous pavement with fiber. See outside link.