Summary
Asbestos abatement contract for the abatement of asbestos-containing floor tile with associated black mastic, ceiling texture with associated plaster,
vermiculite CMU block wall insulation, and any exposed asbestos-containing thermal systems insulation (TSI). The abatement project will be broken out into 2 phases: Phase 1 will be located in various areas throughout level 2 within the School and will involve the removal and disposal of: approx. 6,311 SF of asbestos-containing floor tile and associated black mastic. Approx. 653 SF of asbestos-containing ceiling texture and associated plaster. Approx. 80 SF of asbestos-containing vermiculite CMU block wall insulation (must deface
the CMU wall to access all insulation). Phase 2 will be located in the "POD" area within the School and will involve the removal and disposal of: approx. 15,508 SF of asbestos-containing floor tile and associated black mastic.
Approx. 1,116 SF of asbestos-containing ceiling texture and associated plaster.
Approx. 13,776 ft3 (cubic ft.) of asbestos-containing vermiculite CMU block wall insulation (must deface the CMU wall to access all insulation).
All TSI exposed during the demolition process (may be multiple trips).