Summary
Construction of Arthur Drake/Tsali Boardwalk Removal and Replacement. Temporary Erosion and Sediment Control including temporary silt fence, mud mat maintained, safety fencing and barricades are to be utilized. Removal of and disposal of approx. 230 LF x 8' wide of existing wood framed boardwalk along with a 9'x11' wood platform deck. Disposal fees should be noted. It is the intent of this bid that all material and labor to remove the existing and construct the new Macon County Arthur Drake/Tsali Boardwalk. Construct new boardwalk approx 230 LF x 8’ wide with 9x11 platform, complete including all structural components and end concrete treatment, as identified on the plans to include structure/piles, joists/girders, decking rail chain link fence system and sign/kiosk replacement. Complete new structural columns and concrete work along with the railing system and composite decking.