Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Borough of Ramsey
Construction of a new PFAS treatment building including foundation excavation and construction, electrical and instrumentation work, HVAC equipment work, and furnishing and installation of PFAS treatment system equipment; excavation and installation of underground piping and conduit; construction of site improvements; and all other incidental work associated with the construction of the PFAS water treatment facility as shown on the Contract Drawings and indicated in the Contract Specifications.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Suburban Water System
Project consists of installation of 15 MGD PFAS removal, ion exchange (IX) treatment plant.
Posted Date
-
Due Date
Dec 4, 2025
Release: -
Suburban Water System
Close: Dec 4, 2025
Project consists of installation of 15 MGD PFAS removal, ion exchange (IX) treatment plant.
AvailableOak Lodge Water Services District
Demolish an abandoned buried chlorine contact tank and construct a tertiary treatment facility in the resulting open site at the wastewater treatment plant.
Posted Date
Oct 27, 2025
Due Date
Dec 4, 2025
Release: Oct 27, 2025
Oak Lodge Water Services District
Close: Dec 4, 2025
Demolish an abandoned buried chlorine contact tank and construct a tertiary treatment facility in the resulting open site at the wastewater treatment plant.
AvailableWestbury Water District
Work construction of a new granular activated carbon treatment facility including a new building enclosure and new piping, valves, chemical treatment, standby generator, and all appurtenances and accessories. The work also includes all associated connections to the existing wells at the site, power, controls, scada, all wiring and devices, site paving and restoration, and other utility work.
Posted Date
Oct 22, 2025
Due Date
Dec 3, 2025
Release: Oct 22, 2025
Westbury Water District
Close: Dec 3, 2025
Work construction of a new granular activated carbon treatment facility including a new building enclosure and new piping, valves, chemical treatment, standby generator, and all appurtenances and accessories. The work also includes all associated connections to the existing wells at the site, power, controls, scada, all wiring and devices, site paving and restoration, and other utility work.
AvailableOrange County Water District
Includes construction of a twelve ion exchange pressure vessels, three pre-treatment cartridge filter vessels, and on-site sodium hypochlorite generation system with chemical storage for the removal of PFAS and disinfection of raw water produced from City wells 18, 32, 36 and 39. The project includes sand separator installation for well 32; well pump and motor upgrades and piping replacements for wells 18, 36 and 39; replacement of the existing hydro- generator; piping improvements; construction of a new well 39 electrical building and well 18 well building; electrical and control improvements; programming; site improvements; and landscaping.
Posted Date
Sep 30, 2025
Due Date
Nov 20, 2025
Release: Sep 30, 2025
Orange County Water District
Close: Nov 20, 2025
Includes construction of a twelve ion exchange pressure vessels, three pre-treatment cartridge filter vessels, and on-site sodium hypochlorite generation system with chemical storage for the removal of PFAS and disinfection of raw water produced from City wells 18, 32, 36 and 39. The project includes sand separator installation for well 32; well pump and motor upgrades and piping replacements for wells 18, 36 and 39; replacement of the existing hydro- generator; piping improvements; construction of a new well 39 electrical building and well 18 well building; electrical and control improvements; programming; site improvements; and landscaping.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis