Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Montgomery County Engineer is soliciting bids for the Arlington Road Bridge Replacement Project in the City of Brookville, Ohio. Bids are due December 17, 2025 at 1:30 PM local time and submissions will only be accepted via Bid Express. Contract documents and full specifications are available from the buyer’s procurement portal linked on the Bid Banana listing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Montgomery County (Ohio) Engineer has issued a solicitation for the Arlington Road Bridge Replacement Project in the City of Brookville seeking qualified contractors to replace the Arlington Road Bridge. Bids must be submitted electronically via Bid Express by 1:30 PM local time on Wednesday, December 17, 2025.
Posted Date
Nov 28, 2025
Due Date
Dec 17, 2025
Release: Nov 28, 2025
Close: Dec 17, 2025
Montgomery County (Ohio) Engineer has issued a solicitation for the Arlington Road Bridge Replacement Project in the City of Brookville seeking qualified contractors to replace the Arlington Road Bridge. Bids must be submitted electronically via Bid Express by 1:30 PM local time on Wednesday, December 17, 2025.
Premium
Access the largest public sector contact database
Work consists of 1 LS clearing and grubbing; 499 SY subgrade compaction; 455 LF full depth pavement sawing; 1,678 SF 4" concrete walk; 515 LF combination curb and gutter, type 2; 78 CY topsoil; 700 SY seeding and mulching, class 1; 1 EA erosion control; 25 LF 12" conduit, type b; 1 EA catch basin, no. 3a; 713 SY pavement planing, asphalt concrete; 84 CY aggregate base; 196 GAL tack coat; 43 CY asphalt concrete surface course, type 1; 1 EA 6" gate valve and valve box; 2 EA 10" inserting valve and valve box; 1 EA fire hydrant removed and reset; 100 LF water work, misc. ; 353 LF pavement marking, misc.
Posted Date
Dec 28, 2025
Due Date
Dec 17, 2025
Release: Dec 28, 2025
Close: Dec 17, 2025
Work consists of 1 LS clearing and grubbing; 499 SY subgrade compaction; 455 LF full depth pavement sawing; 1,678 SF 4" concrete walk; 515 LF combination curb and gutter, type 2; 78 CY topsoil; 700 SY seeding and mulching, class 1; 1 EA erosion control; 25 LF 12" conduit, type b; 1 EA catch basin, no. 3a; 713 SY pavement planing, asphalt concrete; 84 CY aggregate base; 196 GAL tack coat; 43 CY asphalt concrete surface course, type 1; 1 EA 6" gate valve and valve box; 2 EA 10" inserting valve and valve box; 1 EA fire hydrant removed and reset; 100 LF water work, misc. ; 353 LF pavement marking, misc.
AvailableProvide surveying services for the ellis road bridge replacement project.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
Close: Dec 16, 2025
Provide surveying services for the ellis road bridge replacement project.
AvailablePeru west section line road bridge replacement design/build project.
Posted Date
Oct 31, 2025
Due Date
Dec 18, 2025
Release: Oct 31, 2025
Close: Dec 18, 2025
Peru west section line road bridge replacement design/build project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis