Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work includes the construction of approx. 2,100 LF of 10" forcemain (HDD); 275 LF of 10" forcemain (open cut); 1 LS lift station valve vault; 100 LF concrete curb; 3,200 LF abandon forcemain; 1,100 SFf pavement markings; 2 EA hydrant; 13 LF sewer manhole; 800 SY pavement restoration; 250 SY hydro-mulch/seeding.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Work includes installation of a new lift station and demolition/abandonment of the existing lift station. Maintaining operations of all systems during construction. Installation of new gravity system and other work.
Posted Date
Nov 7, 2025
Due Date
Jan 7, 2026
Release: Nov 7, 2025
Close: Jan 7, 2026
Work includes installation of a new lift station and demolition/abandonment of the existing lift station. Maintaining operations of all systems during construction. Installation of new gravity system and other work.
AvailableProject involves the replacement of an existing small wastewater lift station. Demolition of existing lift station, including removing existing lift station, removing pavements, removing existing equipment and piping, complete in place; Package Lift Station, includes Pumps, Piping, Fittings, Guide Rails, Lift Chains, Vent, Hatches, Valves, Valve Pit, Electrical Equipment Installation including, but not limited to: lift station control panel, terminal boxes, main breaker, manual transfer switch, conduit, wire, and all ancillary devices; 10 LF Proposed 2" PVC SCHED 40 Sanitary Sewer Force Main;
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
Project involves the replacement of an existing small wastewater lift station. Demolition of existing lift station, including removing existing lift station, removing pavements, removing existing equipment and piping, complete in place; Package Lift Station, includes Pumps, Piping, Fittings, Guide Rails, Lift Chains, Vent, Hatches, Valves, Valve Pit, Electrical Equipment Installation including, but not limited to: lift station control panel, terminal boxes, main breaker, manual transfer switch, conduit, wire, and all ancillary devices; 10 LF Proposed 2" PVC SCHED 40 Sanitary Sewer Force Main;
AvailableSingle-prime construction contract for rehabilitation of Dewey Street dry weather pump station and associated forcemain: CIPP lining ~3,600 LF of 36" force main; installation of new dry-weather pumps; wet well top slab reconstruction; existing building demolitions; electrical upgrades; monorail crane installation. Bid security of 5% required and contractors must submit an affirmative action plan.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Single-prime construction contract for rehabilitation of Dewey Street dry weather pump station and associated forcemain: CIPP lining ~3,600 LF of 36" force main; installation of new dry-weather pumps; wet well top slab reconstruction; existing building demolitions; electrical upgrades; monorail crane installation. Bid security of 5% required and contractors must submit an affirmative action plan.
AvailableIndian Creek Village (Town of Indian Creek Village, FL) is soliciting qualifications for the construction of a new sewer master pump station and approximately 4" forcemain. A non-mandatory virtual pre-RFQ conference is scheduled for December 3, 2025 at 10:30 AM, and submittals are due December 22, 2025. Procurement is a Request for Qualifications (construction services) - not a grant - and full bid documents are distributed via DemandStar (buyer's distribution channel), requiring registration to download.
Posted Date
Nov 24, 2025
Due Date
Dec 22, 2025
Release: Nov 24, 2025
Close: Dec 22, 2025
Indian Creek Village (Town of Indian Creek Village, FL) is soliciting qualifications for the construction of a new sewer master pump station and approximately 4" forcemain. A non-mandatory virtual pre-RFQ conference is scheduled for December 3, 2025 at 10:30 AM, and submittals are due December 22, 2025. Procurement is a Request for Qualifications (construction services) - not a grant - and full bid documents are distributed via DemandStar (buyer's distribution channel), requiring registration to download.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis