Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide architectural design services for window and door replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Seeking architectural and engineering services.
Posted Date
Nov 29, 2025
Due Date
Dec 15, 2025
Release: Nov 29, 2025
Close: Dec 15, 2025
Seeking architectural and engineering services.
AvailablePremium
Access the largest public sector contact database
Work consist of roll-up door replacement.
Posted Date
Nov 17, 2025
Due Date
Dec 18, 2025
Release: Nov 17, 2025
Close: Dec 18, 2025
Work consist of roll-up door replacement.
AvailableProvide Architectural and Engineering Professional Design Services for the Wenatchee High School Replacement Project. The project consists of a phased replacement of the existing Wenatchee High School on the same site as the current facility (new-in-lieu).
Posted Date
Nov 18, 2025
Due Date
Jan 6, 2026
Release: Nov 18, 2025
Close: Jan 6, 2026
Provide Architectural and Engineering Professional Design Services for the Wenatchee High School Replacement Project. The project consists of a phased replacement of the existing Wenatchee High School on the same site as the current facility (new-in-lieu).
AvailableWork include repair and replacement of glass window/doors, including replacement of caulk and rubber seals at all building heights (one story buildings to high-rises), to include adjacent parking garages, if applicable. Window/door glass repair and/or replacement excludes vehicle glass.
Posted Date
Jun 6, 2024
Due Date
Jun 5, 2029
Release: Jun 6, 2024
Close: Jun 5, 2029
Work include repair and replacement of glass window/doors, including replacement of caulk and rubber seals at all building heights (one story buildings to high-rises), to include adjacent parking garages, if applicable. Window/door glass repair and/or replacement excludes vehicle glass.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis