Summary
The purpose of this project is to utilize a "complete streets" design approach, aiming to enhance pedestrian safety, implement traffic calming measures and utilize landscaping and placemaking appurtenances to revitalize the area. The project is approximately 2,100 ft in length. The scope of work generally consists of the construction of new concrete sidewalks and sidewalk ramps, brick paver sidewalk and sidewalk ramps, curbing, proposed
bump outs, new mid-block crossings, restriping, new signage, limited drainage improvements, brick paver banding, proposed ornamental street lighting, street trees and minor landscaping, new placemaking appurtenances, and traffic signal improvements. See attached files.