Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work of this project generally includes, but is not limited to, asbestos/hazardous material abatement, demolition of the animal science and maintenance buildings, 2 concrete storage buildings, 2 wood salt sheds, associated interior plumbing and electrical work in the education building, the removal of 2 fuel tanks and a waste oil tank.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Metro transit phase 3A maintenance and driver facility improvements. See outside link.
Posted Date
Nov 1, 2024
Due Date
Dec 18, 2025
Release: Nov 1, 2024
Close: Dec 18, 2025
Metro transit phase 3A maintenance and driver facility improvements. See outside link.
AvailablePremium
Access the largest public sector contact database
Phase 1 consists of selective building demolition including hazardous material removal, wall and ceiling assemblies, finishes, plumbing, mechanical, electrical, and fire alarm systems. The building shall remain unoccupied until phase 2 (Renovation) beneficial occupancy or final completion.
Posted Date
Dec 12, 2025
Due Date
Jan 15, 2026
Release: Dec 12, 2025
Close: Jan 15, 2026
Phase 1 consists of selective building demolition including hazardous material removal, wall and ceiling assemblies, finishes, plumbing, mechanical, electrical, and fire alarm systems. The building shall remain unoccupied until phase 2 (Renovation) beneficial occupancy or final completion.
AvailableDisconnecting and capping of existing utilities, demolition of main building. Removal of all foundations, fill in foundations, removal of drive-through columns, median and other building related equipment, and clearing and grading of site to drain, and restoration of site by seeding will also be included. The building(s) have been found to include asbestos and a copy of the inspection report is included in the contract documents. Contract includes environmental abatement for each property as necessary.
Posted Date
Dec 5, 2025
Due Date
Jan 6, 2026
Release: Dec 5, 2025
Close: Jan 6, 2026
Disconnecting and capping of existing utilities, demolition of main building. Removal of all foundations, fill in foundations, removal of drive-through columns, median and other building related equipment, and clearing and grading of site to drain, and restoration of site by seeding will also be included. The building(s) have been found to include asbestos and a copy of the inspection report is included in the contract documents. Contract includes environmental abatement for each property as necessary.
AvailableConstruction management services for: phase 3 of building no. 34- science center ren/rem.
Posted Date
Nov 12, 2025
Due Date
Jan 2, 2026
Release: Nov 12, 2025
Close: Jan 2, 2026
Construction management services for: phase 3 of building no. 34- science center ren/rem.