Summary
Requirements for the CLS necessary to sustain the currently fielded TMQ-53 systems, in their baseline configuration worldwide IAW the requirements. This includes, but is not limited to Program Management, Logistics Support (Helpdesk Support, Maintenance, Spares and Repair Management), Operational, Safety, Suitability, and Effectiveness (OSS&E) impact analysis, Test and Evaluation support, Configuration Control Board (CCB) support, and Obsolescence and Systems Engineering. Further, all system performance data, such as System Availability rates, Mission Capable rates, and Mean Time between Failure (MTBF) rates, shall be collected and reported. Additionally, program data shall be collected and reported, such as Government-Furnished Materiel-A (GFM-A) Management, materials, shipping, travel, etc. See attached file.