Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The replacement of a water main, includes: aggregate base; non-tracking tack coat; asphalt concrete surface course; concrete walk; sanitary sewer lateral repair; fire hydrant assembly; water service branch; gate valve.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
Posted Date
Dec 14, 2025
Due Date
Jan 28, 2026
Release: Dec 14, 2025
Close: Jan 28, 2026
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of approx. 3,000 LF of water main. The new water main will replace the existing cast iron main. This water main replacement includes replacement of associated valves, hydrants and service lines. Replacement will start at DeLorme Drive and extend north on Route 1 to the Cousins River bridge. The existing cast iron water mains on Route 1 will be abandoned in place. The materials furnished by Owner are indicated in the contract documents. The Contractor shall install materials furnished by the Owner. The project is in advance of proposed work by MaineDOT to extend the Beth Condon walking trail on the southerly shoulder of Route 1. The base bid is designed around replacement of water main via open cut installation. A bid alternate is included for water main installation via horizontal directional drill.
Posted Date
Jan 12, 2026
Due Date
Feb 12, 2026
Release: Jan 12, 2026
Close: Feb 12, 2026
Replacement of approx. 3,000 LF of water main. The new water main will replace the existing cast iron main. This water main replacement includes replacement of associated valves, hydrants and service lines. Replacement will start at DeLorme Drive and extend north on Route 1 to the Cousins River bridge. The existing cast iron water mains on Route 1 will be abandoned in place. The materials furnished by Owner are indicated in the contract documents. The Contractor shall install materials furnished by the Owner. The project is in advance of proposed work by MaineDOT to extend the Beth Condon walking trail on the southerly shoulder of Route 1. The base bid is designed around replacement of water main via open cut installation. A bid alternate is included for water main installation via horizontal directional drill.
AvailableProject consists of the replacement and installation of water distribution improvements, including 8" DIP water main, valves, fire hydrant assemblies, service lines, roadway and creek crossings (open-cut and bore), steel encasement, vault construction, restoration, and related appurtenances. Alternative work may include 10" HDPE pipe installed by HDD in place of some 8" DIP.
Posted Date
Jan 18, 2026
Due Date
Feb 10, 2026
Release: Jan 18, 2026
Close: Feb 10, 2026
Project consists of the replacement and installation of water distribution improvements, including 8" DIP water main, valves, fire hydrant assemblies, service lines, roadway and creek crossings (open-cut and bore), steel encasement, vault construction, restoration, and related appurtenances. Alternative work may include 10" HDPE pipe installed by HDD in place of some 8" DIP.
AvailableCommercial water heater replacement.
Posted Date
Dec 18, 2025
Due Date
Feb 13, 2026
Release: Dec 18, 2025
Close: Feb 13, 2026
Commercial water heater replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →