Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The purpose of this proposal is to obtain price quotes from a service provider to provide all labor, equipment, materials, supervision, scheduling and services required to install Advanced Metering Infrastructure (AMI) electric meters at customer locations within the HPU service area. The service provider or contractor shall perform all work in accordance with the utility’s standards, applicable state codes, safety requirements, and manufacturer specifications.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The purpose of this proposal is to obtain price quotes from a service provider to provide all labor, equipment, materials, supervision, scheduling and services required to install Advanced Metering Infrastructure (AMI) of gas meters at customer locations within the HPU service area. The service provider or contractor shall perform all work in accordance with the utility’s standards, applicable state codes, safety requirements, and manufacturer specifications.
Posted Date
Dec 19, 2025
Due Date
Jan 16, 2026
Release: Dec 19, 2025
Close: Jan 16, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The purpose of this proposal is to obtain price quotes from a service provider to provide all labor, equipment, materials, supervision, scheduling and services required to install Advanced Metering Infrastructure (AMI) of gas meters at customer locations within the HPU service area. The service provider or contractor shall perform all work in accordance with the utility’s standards, applicable state codes, safety requirements, and manufacturer specifications.
The purpose of this proposal is to obtain price quotes from a service provider to provide all labor, equipment, materials, supervision, scheduling and services required to install Advanced Metering Infrastructure (AMI) of water meters at customer locations within the HPU service area. The service provider or contractor shall perform all work in accordance with the utility’s standards, applicable state codes, safety requirements, and manufacturer specifications.
Posted Date
Dec 19, 2025
Due Date
Jan 16, 2026
Release: Dec 19, 2025
Close: Jan 16, 2026
The purpose of this proposal is to obtain price quotes from a service provider to provide all labor, equipment, materials, supervision, scheduling and services required to install Advanced Metering Infrastructure (AMI) of water meters at customer locations within the HPU service area. The service provider or contractor shall perform all work in accordance with the utility’s standards, applicable state codes, safety requirements, and manufacturer specifications.
AvailableReplace existing water meters. Project includes the furnishing of specified meters, software, hardware, and radios 100% compatible with the current sensus flexnet water & gas meter reading system as part of the project to remove the city s existing water meters and replace with ami water meter system that is fully compatible with the current billing and finance software system.
Posted Date
Dec 3, 2025
Due Date
Jan 23, 2026
Release: Dec 3, 2025
Close: Jan 23, 2026
Replace existing water meters. Project includes the furnishing of specified meters, software, hardware, and radios 100% compatible with the current sensus flexnet water & gas meter reading system as part of the project to remove the city s existing water meters and replace with ami water meter system that is fully compatible with the current billing and finance software system.
AvailableAdvanced water meter solution for the city's approx., 22,450 water meters which includes the supply and installation of non-mechanical water meters and radio transmitters as well as an advanced metering infrastructure software and related training services.
Posted Date
Nov 19, 2025
Due Date
Jan 14, 2026
Release: Nov 19, 2025
Close: Jan 14, 2026
Advanced water meter solution for the city's approx., 22,450 water meters which includes the supply and installation of non-mechanical water meters and radio transmitters as well as an advanced metering infrastructure software and related training services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →