Summary
Work includes (all values are approximate) 900-1f HDPE stormdrain, piping, inlets, and channels, and offsite disposal of excess rock and earthen material along with associated erosion and sediment control measures. Price shall encompass a complete project, per the plans and specifications, to include but not limited to, mobilization; utility marking, permits; erosion & sediment control; demolition; trenching, sheeting, shoring and dewatering; bedding, pipe installation, backfill, and compaction; utility replacements, relocations, or temporary bracing and shoring; temporary patching and permanent pavement replacement; re-establishment of green areas and landscaping, testing, record drawings, and all elements necessary to complete the Work in a complete and first class manner.