Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Work consists of: New construction of a one-story structural-steel frame building on poured in place concrete foundations. Insulated Metal Panel roof deck and wall panels, masonry veneer & aluminum siding Z girt backup, aluminum framed windows, and membrane roof. New plumbing, HVAC, and electrical systems. A loading area, sidewalks, and other site improvements. Installation of Owner furnished items and materials. Coordination of Owner provided items and materials.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of store remodeling. See outside link.
Posted Date
-
Due Date
Jan 12, 2026
Close: Jan 12, 2026
Project consists of store remodeling. See outside link.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of new construction.
Posted Date
-
Due Date
Jan 27, 2026
Release: -
Close: Jan 27, 2026
Project consists of new construction.
AvailableWork includes demolition of part of an existing building for the construction of a new aldi store includes building demolition, concrete cutting, cast in place concrete, sealed concrete, site concrete, masonry, steel, structural steel erection, misc. metals, rough carpentry, finished carpentry, eifs, aluminum composite panel, siding, single ply membrane roof, joint sealers and caulking, overhead doors, flexible traffic doors, entrances and storefronts, gypsum drywall, tile, acoustical ceilings, paints and coatings, toilet partitions and accessories, wall and corner guards, shelving, misc. specialities, loading dock equipment, fire protection, plumbing, HVAC, electrical. See outside link.
Posted Date
-
Due Date
Jan 22, 2026
Release: -
Close: Jan 22, 2026
Work includes demolition of part of an existing building for the construction of a new aldi store includes building demolition, concrete cutting, cast in place concrete, sealed concrete, site concrete, masonry, steel, structural steel erection, misc. metals, rough carpentry, finished carpentry, eifs, aluminum composite panel, siding, single ply membrane roof, joint sealers and caulking, overhead doors, flexible traffic doors, entrances and storefronts, gypsum drywall, tile, acoustical ceilings, paints and coatings, toilet partitions and accessories, wall and corner guards, shelving, misc. specialities, loading dock equipment, fire protection, plumbing, HVAC, electrical. See outside link.
AvailableSeeking a qualified Supplier for MSD's employee Online Apparel and Retail Store.
Posted Date
Dec 5, 2025
Due Date
Jan 13, 2026
Release: Dec 5, 2025
Close: Jan 13, 2026
Seeking a qualified Supplier for MSD's employee Online Apparel and Retail Store.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →