Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of approx. 2475 feet of security/wildlife fence along the west side of the airport and at the access point to the apron. The first section in this process will be the installation of approx. 35 feet of 96” 9ga GAW security fencing with 3 strands of barbed wire between Hangar 7 and Hangar 9. Section 2 of this project includes the installation of approx. 200 feet of 96” 9ga GAW security fencing with 3 strands of barbed wire fence plus one (1) pedestrian gate. This fence will be located adjacent to the parking lot between Building 4A and Hangar 26. The pedestrian gate will be installed immediately adjacent to Hangar 26 and shall be operated using a key pad with a minimum of 200 available codes. Section 3 includes the installation of approx. 2,230 feet of 96”, 9ga GAW with 3 strands of barbed wire at the top and a 20’ automatic gate. The gate will be located at the corner of Hangar 26, approx. 20 feet from the building. The gate shall be operated using a key pad with a minimum of 200 available codes.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Design-build of an 8000 sq. ft. single slope maintenance shop with three garage doors (two 20'W x 14'H, one 12'W x 14'H), including utility stub-ins, 8" concrete, R30 roofing, and R19 wall insulation, at Philip Billard Airport.
Posted Date
Dec 23, 2025
Due Date
Feb 3, 2026
Release: Dec 23, 2025
Close: Feb 3, 2026
Design-build of an 8000 sq. ft. single slope maintenance shop with three garage doors (two 20'W x 14'H, one 12'W x 14'H), including utility stub-ins, 8" concrete, R30 roofing, and R19 wall insulation, at Philip Billard Airport.
AvailableDESIGN-BUILD: This is a design-build project to construct a new maintenance shop at airport.
Posted Date
Jan 13, 2026
Due Date
Feb 3, 2026
Release: Jan 13, 2026
Close: Feb 3, 2026
DESIGN-BUILD: This is a design-build project to construct a new maintenance shop at airport.
AvailableProcurement of professional airport engineering consulting services for the Bisbee Municipal Airport.
Posted Date
-
Due Date
Feb 24, 2026
Close: Feb 24, 2026
Procurement of professional airport engineering consulting services for the Bisbee Municipal Airport.
AvailableThe City of LaFayette seeks a qualified aviation consulting firm to provide on-call engineering, architectural, and construction inspection/administration services for the Barwick-LaFayette Airport under a multi-year Master Agreement. The scope includes project funding applications, design, bidding, construction administration and resident inspection, DBE program assistance, pavement/lighting/facility work, fencing/security, obstruction removal, and other airport-related engineering tasks. The contract period is five years and firms must be prequalified with the Georgia Department of Transportation in specified airport-related area classes.
Posted Date
-
Due Date
Feb 11, 2026
Close: Feb 11, 2026
The City of LaFayette seeks a qualified aviation consulting firm to provide on-call engineering, architectural, and construction inspection/administration services for the Barwick-LaFayette Airport under a multi-year Master Agreement. The scope includes project funding applications, design, bidding, construction administration and resident inspection, DBE program assistance, pavement/lighting/facility work, fencing/security, obstruction removal, and other airport-related engineering tasks. The contract period is five years and firms must be prequalified with the Georgia Department of Transportation in specified airport-related area classes.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis