Summary
Qualified contractors to complete an airfield marking application project. To enter into a contract with the best valued Contractor to perform surface preparation, removal (as needed) and reapplication of all existing markings identified below: ii. Airports non-lease gates markings. The focus of this project is painting existing lines
and maintaining high-visibility, regulatory-compliant markings on airport aprons, including aircraft lead-in lines (12" yellow), wingtip safety lines, and nose wheel stop bars. includes surface preparation (cleaning, removing old paint) and painting of
gate designations, lead-in lines, stop bars, and passenger boarding bridge (PBB) safety lines. Work will need to perform and coordinated with the airlines to not impact operations. The airport currently has seven non-lease gates and four hardstands that will need repainting.
iii. We currently need to add a stop bar at gate A2 for A220/E190/E195. The winning bidder will get a separate drawing for this work.
iv. Contractors will need ensure to have the current stencils and paint for this job.