Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of 104,590 SF cold-mill existing AC pavement (1.5" min.), 190 LF remove, salvage, and relocate existing chain link fence, 617 LF sawcut and remove existing PCC curb and/or gutter, 7,853 SF sawcut and remove existing PCC driveway access, sidewalk, ramp, driveway, spandrel, and/or cross gutter, 38,001 SF remove existing AC pavement, aggregate base, 1,430 TN construct 1.5" asphalt concrete pavement overlay, 12,202 SF construct 4" PCC sidewalk, 150 LF install new chain link fence, see outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Rockville is seeking a consultant to design a shared-use path along Fleet Street and Monroe Street, including planning, preliminary and final design, construction plans, cost estimates, and construction specifications. The project duration is approximately 13 months with total funding authority of $390,945.00 and the solicitation closes on 2025-12-12.
Posted Date
Oct 24, 2025
Due Date
Dec 12, 2025
Release: Oct 24, 2025
Close: Dec 12, 2025
The City of Rockville is seeking a consultant to design a shared-use path along Fleet Street and Monroe Street, including planning, preliminary and final design, construction plans, cost estimates, and construction specifications. The project duration is approximately 13 months with total funding authority of $390,945.00 and the solicitation closes on 2025-12-12.
Premium
Access the largest public sector contact database
The City of Kissimmee (Purchasing Division) requests qualifications from an FDOT-prequalified consulting engineering firm to provide professional design services for the Columbia Avenue Complete Street project, including roadway reconstruction, sidewalks, bicycle protection measures, streetscape elements, decorative lighting, and utility adjustments. The RFQ is for design/engineering (work type 3.2) and includes a non-mandatory pre-bid meeting on December 10, 2025. The solicitation is advertised as an RFQ (Request for Qualifications) with bid documents published and a submission due date of December 30, 2025.
Posted Date
Nov 23, 2025
Due Date
Dec 30, 2025
Release: Nov 23, 2025
Close: Dec 30, 2025
The City of Kissimmee (Purchasing Division) requests qualifications from an FDOT-prequalified consulting engineering firm to provide professional design services for the Columbia Avenue Complete Street project, including roadway reconstruction, sidewalks, bicycle protection measures, streetscape elements, decorative lighting, and utility adjustments. The RFQ is for design/engineering (work type 3.2) and includes a non-mandatory pre-bid meeting on December 10, 2025. The solicitation is advertised as an RFQ (Request for Qualifications) with bid documents published and a submission due date of December 30, 2025.
AvailableSeeking qualified firms to provide planning services to develop Complete Street Guidelines & Recommendations to fulfill the federal requirement that 2.5% of PL funding be spent on safety and Complete Streets planning
Posted Date
Dec 3, 2025
Due Date
Dec 19, 2025
Release: Dec 3, 2025
Close: Dec 19, 2025
Seeking qualified firms to provide planning services to develop Complete Street Guidelines & Recommendations to fulfill the federal requirement that 2.5% of PL funding be spent on safety and Complete Streets planning
AvailableStreet reconstruction project.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
Close: Dec 18, 2025
Street reconstruction project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis