Retrieving RFP details
Release
Close
City of Hernando
Work includes roadway earthwork, grading, paving, curb and gutter.
80-20250930140402 HERNANDO
City of Fullerton
The work shall consist of, but not limited to, sidewalk, curb and gutter, pcc curb only, and driveway approaches, including root pruning and clear and grub of tree roots for concrete reconstruction.
Michigan Department of Technology, Management and Budget
Work includes 0. 30 mi of concrete sidewalk and ramps, concrete curb and gutter, pedestrian refuge, hot mix asphalt hand patching, and permanent pavement markings that also includes 9 EA culv, rem, less than 24 inch; 610 LF curb and gutter, rem; 282 SY pavt, rem; 53 SY sidewalk, rem; 1,150 CY excavation, earth; 500 LF erosion control, silt fence; 250 LF sewer, cl a, perforated slcpp w\sock, 12 inch, tr det b, modifed. See attached file.
North Dakota Department of Transportation
Work includes PCC pavement, curb & gutter, curb ramps, street lighting, traffic signal, signing and pavement marking. Includes 1 LS removal of trees & brush; 859 SY removal of concrete pavement; 1343 LF removal of curb & gutter; 408 SY sod; 1728 ton aggregate base course cl 5; 883 SY 8" non-reinf concrete pavement cl ae-doweled; see attached files.
Release
Oct 02, 2025
Close
Nov 06, 2025