Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of a 3 story addition consisting of insulated concrete form and face brick. Interior walls are metal stud with drywall. Floor system consist of steel bar joists, steel deck, concrete with wood roof trusses. Existing building is on the historical register. The new addition shall be built first and then the renovation work may be started.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project includes but is not limited to renovation of the existing fire station and construction of a new addition. Work will involve site improvements, new utility connections, and removal and replacement of paving. Renovation scope includes interior and exterior updates to convert the existing building into administrative & training spaces. The new addition will provide a fire apparatus garage along with a connector linking it to the existing structure.
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
The project includes but is not limited to renovation of the existing fire station and construction of a new addition. Work will involve site improvements, new utility connections, and removal and replacement of paving. Renovation scope includes interior and exterior updates to convert the existing building into administrative & training spaces. The new addition will provide a fire apparatus garage along with a connector linking it to the existing structure.
Premium
Access the largest public sector contact database
Memorial Library - Addition & Renovation.
Posted Date
Dec 8, 2025
Due Date
Dec 16, 2025
Release: Dec 8, 2025
Close: Dec 16, 2025
Memorial Library - Addition & Renovation.
AvailableFurnish and install AV equipment associated with the room addition and renovation project.
Posted Date
Dec 9, 2025
Due Date
Jan 5, 2026
Release: Dec 9, 2025
Close: Jan 5, 2026
Furnish and install AV equipment associated with the room addition and renovation project.
AvailableWork includes hauser hall renovation and addition, demolition and abatement, structural concrete, structural steel, elevator.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
Close: Dec 16, 2025
Work includes hauser hall renovation and addition, demolition and abatement, structural concrete, structural steel, elevator.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis