Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the ATCS cabinet/controller replacement, Advanced Traffic Signal Performance Measure (ATSPM) detection upgrade, new CCTV for enhanced video coverage for intersections and the corridor, Illuminated Street Name Sign (ISNS) replacement, and other system upgrades such as Ethernet switches and Fiber Optic Patch Panel (FOPP) and conduits system installation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Furnish and deliver miscellaneous traffic signal equipment for the City of Worcester Department of Transportation & Mobility.
Posted Date
Dec 10, 2025
Due Date
Dec 31, 2025
Release: Dec 10, 2025
Close: Dec 31, 2025
Furnish and deliver miscellaneous traffic signal equipment for the City of Worcester Department of Transportation & Mobility.
AvailableProject consists of upgrading the traffic signal equipment at thirteen intersections to add flashing yellow arrow displays for the left turn movement as required. Install basic network device configuration and test ip addressable equipment with the department's network. Traffic control signal installations shall meet the appropriate nesc requirements. Furnish and install electrical cables for traffic control devices and the power service as required. Ground the controller cabinet assemblies, controller, poles, pullboxes, and conduit to reduce extraneous voltage to protect personnel or equipment; etc, see attached file.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Project consists of upgrading the traffic signal equipment at thirteen intersections to add flashing yellow arrow displays for the left turn movement as required. Install basic network device configuration and test ip addressable equipment with the department's network. Traffic control signal installations shall meet the appropriate nesc requirements. Furnish and install electrical cables for traffic control devices and the power service as required. Ground the controller cabinet assemblies, controller, poles, pullboxes, and conduit to reduce extraneous voltage to protect personnel or equipment; etc, see attached file.
AvailableThe Township of Middletown (Bucks County, PA) is seeking contractors for traffic signal upgrades, including integration into a Unified Command Control System and replacement of controller units at six intersections. The project also involves adjusting clearance intervals at four intersections and installing a flashing yellow arrow at one, with work expected to be completed within 100 calendar days. Contractors must be pre-qualified with PennDOT and comply with PA Department of Labor and Industry prevailing wage determinations, with responses due by 2026-01-06.
Posted Date
Dec 5, 2025
Due Date
Jan 6, 2026
Release: Dec 5, 2025
Close: Jan 6, 2026
The Township of Middletown (Bucks County, PA) is seeking contractors for traffic signal upgrades, including integration into a Unified Command Control System and replacement of controller units at six intersections. The project also involves adjusting clearance intervals at four intersections and installing a flashing yellow arrow at one, with work expected to be completed within 100 calendar days. Contractors must be pre-qualified with PennDOT and comply with PA Department of Labor and Industry prevailing wage determinations, with responses due by 2026-01-06.
AvailableThe Township of Middletown (Bucks County, PA) is seeking contractors for traffic signal upgrades, including integration into a Unified Command Control System and replacement of controller units at six intersections. The project also involves adjusting clearance intervals at four intersections and installing a flashing yellow arrow at one, with work expected to be completed within 100 calendar days. Contractors must be pre-qualified with PennDOT and comply with PA Department of Labor and Industry prevailing wage determinations, with responses due by 2026-01-06.
Posted Date
Dec 5, 2025
Due Date
Jan 6, 2026
Release: Dec 5, 2025
Close: Jan 6, 2026
The Township of Middletown (Bucks County, PA) is seeking contractors for traffic signal upgrades, including integration into a Unified Command Control System and replacement of controller units at six intersections. The project also involves adjusting clearance intervals at four intersections and installing a flashing yellow arrow at one, with work expected to be completed within 100 calendar days. Contractors must be pre-qualified with PennDOT and comply with PA Department of Labor and Industry prevailing wage determinations, with responses due by 2026-01-06.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis