Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Clovis is seeking bids for ADA Sidewalk Improvements Citywide, identified as Invitation # CIP 25-07. This project involves the installation of missing concrete sidewalk segments, concrete drive approaches, 6-inch concrete retaining curb, mailbox reinstallation, and medium-sized tree removal along the south side of Sierra Avenue east of Willow Avenue. Bids must be filed with the City Clerk at the Clovis Civic Center prior to 2:00 pm PST on January 13, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Placing “No Parking” signs and traffic control, Saw cutting and removing concrete sidewalks, parkways, driveways, access ramps, cross gutters, curbs and gutters, Constructing new concrete sidewalks, parkways, driveways, access ramps, cross gutters, curbs and gutters (utilizing pump if necessary), Patching areas of concrete curb and gutter and sidewalk, Protecting in place existing grade and subgrade of all concrete work, Restoring private improvements, Restoring survey markers damaged or displaced by the work, Painting curb face and tops red where applicable, Installing grass turf as necessary to match existing private grass turf, Providing temporary access during construction.
Posted Date
Dec 10, 2025
Due Date
Jan 8, 2026
Release: Dec 10, 2025
Close: Jan 8, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Placing “No Parking” signs and traffic control, Saw cutting and removing concrete sidewalks, parkways, driveways, access ramps, cross gutters, curbs and gutters, Constructing new concrete sidewalks, parkways, driveways, access ramps, cross gutters, curbs and gutters (utilizing pump if necessary), Patching areas of concrete curb and gutter and sidewalk, Protecting in place existing grade and subgrade of all concrete work, Restoring private improvements, Restoring survey markers damaged or displaced by the work, Painting curb face and tops red where applicable, Installing grass turf as necessary to match existing private grass turf, Providing temporary access during construction.
AvailablePlacing “No Parking” signs and traffic control, Saw cutting and removing concrete sidewalks, parkways, driveways, access ramps, cross gutters, curbs and gutters, Constructing new concrete sidewalks, parkways, driveways, access ramps, cross gutters, curbs and gutters (utilizing pump if necessary), Patching areas of concrete curb and gutter and sidewalk, Protecting in place existing grade and subgrade of all concrete work, Restoring private improvements, Restoring survey markers damaged or displaced by the work, Painting curb face and tops red where applicable, Installing grass turf as necessary to match existing private grass turf, Providing temporary access during construction.
Posted Date
Dec 10, 2025
Due Date
Jan 8, 2026
Release: Dec 10, 2025
Close: Jan 8, 2026
Placing “No Parking” signs and traffic control, Saw cutting and removing concrete sidewalks, parkways, driveways, access ramps, cross gutters, curbs and gutters, Constructing new concrete sidewalks, parkways, driveways, access ramps, cross gutters, curbs and gutters (utilizing pump if necessary), Patching areas of concrete curb and gutter and sidewalk, Protecting in place existing grade and subgrade of all concrete work, Restoring private improvements, Restoring survey markers damaged or displaced by the work, Painting curb face and tops red where applicable, Installing grass turf as necessary to match existing private grass turf, Providing temporary access during construction.
AvailableImprovements will include the new sidewalk, minor stormwater improvements, a section of curb and gutter, handrails, and associated grading in order for the proposed sidewalk to meet ADA standards.
Posted Date
Dec 9, 2025
Due Date
Jan 7, 2026
Release: Dec 9, 2025
Close: Jan 7, 2026
Improvements will include the new sidewalk, minor stormwater improvements, a section of curb and gutter, handrails, and associated grading in order for the proposed sidewalk to meet ADA standards.
AvailableExpansion includes construction of a 280 SY of 4' concrete pedestrian sidewalk and ramp, parking lot, asphalt paving, storm drainage upgrades, associated earthwork, less than 1-acre of grassing and all associated signage and thermoplastic striping.
Posted Date
Dec 16, 2025
Due Date
Jan 22, 2026
Release: Dec 16, 2025
Close: Jan 22, 2026
Expansion includes construction of a 280 SY of 4' concrete pedestrian sidewalk and ramp, parking lot, asphalt paving, storm drainage upgrades, associated earthwork, less than 1-acre of grassing and all associated signage and thermoplastic striping.