Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
ADA bathroom & hallway flooring replacement project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Dec 16, 2025
Close: Jan 12, 2026
Township ADA bathroom upgrades project.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace twenty (20) existing windows located on the second floor of the village hall building.
Posted Date
Dec 15, 2025
Due Date
Jan 6, 2026
Release: Dec 15, 2025
Close: Jan 6, 2026
Replace twenty (20) existing windows located on the second floor of the village hall building.
AvailableBriefly described, work under this contract includes but is not limited to the full replacement of the roofing system for part of the building facility and complete interior bathroom renovation.
Posted Date
Dec 5, 2025
Due Date
Jan 15, 2026
Release: Dec 5, 2025
Close: Jan 15, 2026
Briefly described, work under this contract includes but is not limited to the full replacement of the roofing system for part of the building facility and complete interior bathroom renovation.
AvailableSeeking to procure the renovation of a bathroom. Cover all smoke detector heads throughout the working areas. Removal of tub/ shower and discard. Demolition of entire bathroom and removal of all debris daily. All studs/beams/joists must be exposed for inspection if they are rotted provide new metal studs. (no wood). See attached file.
Posted Date
Dec 11, 2025
Due Date
Jan 22, 2026
Release: Dec 11, 2025
Close: Jan 22, 2026
Seeking to procure the renovation of a bathroom. Cover all smoke detector heads throughout the working areas. Removal of tub/ shower and discard. Demolition of entire bathroom and removal of all debris daily. All studs/beams/joists must be exposed for inspection if they are rotted provide new metal studs. (no wood). See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →