Summary
Gordon State College seeks qualified contractors to remove and replace the existing chiller at the Academic Building, including disposal of the old unit, installation of a new energy-efficient chiller, integration with existing HVAC systems, and compliance with local codes. A mandatory pre-bid meeting is scheduled for March 17, 2026 at 10:00 AM local time at the Facilities conference room on campus; the solicitation requires bid, performance, and payment bonds and other standard public-construction submittal requirements. The solicitation is posted on the Georgia Procurement Registry and is open with a submission deadline of April 7, 2026.