Summary
Work includes removal and replacement of a 40 ton package unit on top of the athletics and fine arts building at the campus. The scope of work shall include but is not limited to: the scope of work shall include but is not limited to: removal and proper disposal of the existing 40 ton package unit all required crane service, rigging, and rooftop placement connection to the existing electrical, gas, ductwork, and controls as applicable start-up testing and verification of proper system operation removal of all debris and clean up compliance with all applicable codes, regulations, and safety requirements.