Summary
Demolition and disposal of the existing three (3) blowers, piping and accessories in the facility 2 north filter gallery. Installation of two (2) owner supplied blowers including transportation of blowers from storage location to installation location. Provide and install all ancillary equipment and associated piping, ducting, insulation, housekeeping pads, and other components necessary for a fully operational system. Modify existing system arrangement as necessary to support new equipment locations, piping routing, and system connections. Apply painting, coatings, and/or insulation to blower piping and ducting. Replace existing power and control cabling between the blower skids, the motor control center, and control panels. Start-up and commissioning of all new equipment and associated systems installed under this contract.