Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Abandonment of approx. 1,300 FT of existing sanitary sewer pipeline and four existing sanitary sewer manholes.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Purpose of conducting rehabilitation of concrete sanitary sewer manholes. This specification covers work, materials and equipment required for rehabilitating unlined concrete manholes by monolithic spray-application of a corrosion protective coating to eliminate infiltration, provide corrosion protection, repair voids and enhance structural integrity. It is anticipated that 20 manholes are to be rehabilitated during this contract period on an as needed basis
Posted Date
Dec 3, 2025
Due Date
Dec 17, 2025
Release: Dec 3, 2025
Close: Dec 17, 2025
Purpose of conducting rehabilitation of concrete sanitary sewer manholes. This specification covers work, materials and equipment required for rehabilitating unlined concrete manholes by monolithic spray-application of a corrosion protective coating to eliminate infiltration, provide corrosion protection, repair voids and enhance structural integrity. It is anticipated that 20 manholes are to be rehabilitated during this contract period on an as needed basis
Premium
Access the largest public sector contact database
Work include Cleaning, televising (pre- and post-construction), and lining 2,452 LF of existing 24" and 4,078 LF of existing 36" sanitary sewer Reinforced Concrete Pipe (RCP) with Cured in Place Pipe (CIPP); bypass pumping to facilitate the CIPP lining of the existing sanitary sewer; the construction of approx 6,460 LF of 12' wide aggregate access driveway, along with associated excavation and grading work; installation approx 1,620 LF of timber matting to cross delineated wetland area, and removal upon completion of the work; installation of 15" to 30" HDPE culvert pipe totaling approx 2,520 LF; installation of erosion and sedimentation control facilities and post construction stormwater management facilities; rehabilitation of approx 33 existing manholes; site stabilization and non-paved restoration; other minor items and appurtenances.
Posted Date
Nov 26, 2025
Due Date
Jan 14, 2026
Release: Nov 26, 2025
Close: Jan 14, 2026
Work include Cleaning, televising (pre- and post-construction), and lining 2,452 LF of existing 24" and 4,078 LF of existing 36" sanitary sewer Reinforced Concrete Pipe (RCP) with Cured in Place Pipe (CIPP); bypass pumping to facilitate the CIPP lining of the existing sanitary sewer; the construction of approx 6,460 LF of 12' wide aggregate access driveway, along with associated excavation and grading work; installation approx 1,620 LF of timber matting to cross delineated wetland area, and removal upon completion of the work; installation of 15" to 30" HDPE culvert pipe totaling approx 2,520 LF; installation of erosion and sedimentation control facilities and post construction stormwater management facilities; rehabilitation of approx 33 existing manholes; site stabilization and non-paved restoration; other minor items and appurtenances.
AvailableRelocation the existing 8" sanitary sewer main and 5 sanitary sewer manholes. The project includes the relocation of approx. 430 LF existing sewer main with the approx. 400 LF of 8" PVC C-900 sewer main. This project also includes the removal of 4 existing sanitary sewer manholes and the installation of 5 new sanitary sewer manholes. Work shall also include all supervision, equipment, traffic control, granular backfill, pavement restoration (milling included), flushing, disinfecting, testing and all appurtenances necessary to complete the work.
Posted Date
Nov 28, 2025
Due Date
Dec 16, 2025
Release: Nov 28, 2025
Close: Dec 16, 2025
Relocation the existing 8" sanitary sewer main and 5 sanitary sewer manholes. The project includes the relocation of approx. 430 LF existing sewer main with the approx. 400 LF of 8" PVC C-900 sewer main. This project also includes the removal of 4 existing sanitary sewer manholes and the installation of 5 new sanitary sewer manholes. Work shall also include all supervision, equipment, traffic control, granular backfill, pavement restoration (milling included), flushing, disinfecting, testing and all appurtenances necessary to complete the work.
Available2022 Sanitary Sewer Improvements Contract No. 5 - Sanitary Sewer Improvements.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
2022 Sanitary Sewer Improvements Contract No. 5 - Sanitary Sewer Improvements.