Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The 139th Mission Support Group contracting office intends to issue a Request for Quote (RFQ) for a single firm fixed-price contract to perform the AATTC South Trailer Reconfiguration including interior network/cabling work and exterior trailer/decking repairs. The project is 100% set aside for small businesses, estimated magnitude of construction $25,000–$100,000, and the contract duration is 30 days after notice to proceed. Scope highlights include creating a network access café with CAT6 ports and cabinet relocation, structural inspection and decking repairs, new guardrail and stairs, removal of cameras/low-voltage wiring, and trailer skirting/access panel removals.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Department of the Army National Guard (139th Mission Support Group) posted a pre-solicitation for the AATTC South Trailer Reconfiguration to perform construction and reconfiguration work (network ports and cabinet relocation, external raceway and CAT6 cabling, in-floor power re-route, door access reconfiguration, structural inspection/repairs, guardrails/stairs, removal of low-voltage wiring and skirting, exterior vapor barriers, pipe insulation and heat tape, and a new awning). The notice estimates the contract value between $25,000 and $100,000, is set aside 100% for small businesses under NAICS 236220, and anticipates a firm-fixed-price RFQ/solicitation issuance in early January 2026 with a pre-quote/site visit planned. The full solicitation and attachments will be available on SAM.gov and interested parties must monitor that page and be registered in SAM to respond.
Posted Date
Dec 22, 2025
Due Date
Jan 6, 2026
Release: Dec 22, 2025
Close: Jan 6, 2026
The Department of the Army National Guard (139th Mission Support Group) posted a pre-solicitation for the AATTC South Trailer Reconfiguration to perform construction and reconfiguration work (network ports and cabinet relocation, external raceway and CAT6 cabling, in-floor power re-route, door access reconfiguration, structural inspection/repairs, guardrails/stairs, removal of low-voltage wiring and skirting, exterior vapor barriers, pipe insulation and heat tape, and a new awning). The notice estimates the contract value between $25,000 and $100,000, is set aside 100% for small businesses under NAICS 236220, and anticipates a firm-fixed-price RFQ/solicitation issuance in early January 2026 with a pre-quote/site visit planned. The full solicitation and attachments will be available on SAM.gov and interested parties must monitor that page and be registered in SAM to respond.
AvailableAATTC South Trailer Reconfiguration project including updating an existing room into a network access café by installing three new quad network access ports, relocating the existing network cabinet, providing an external raceway system with network-appropriate CAT6 cabling, re-directing in-floor power, and reconfiguring existing door access to select doors, installation of a continuous exterior-rated vapor barrier behind skirting, insulation of piping under trailers and heat tape for sewer lines, installation of a lockable access panel, sealing of the building envelope where needed, and placement of a new awning over the exposed entry door with reuse of existing components where feasible. Additionally, prepare North trailers for removal, structural inspection and repairs to the existing decking that joined North and South trailer groups, construction of new guardrail and stairs on decking, removal of cameras and low-voltage wiring from North trailers, removal of North trailer skirting and lockable access panel.
Posted Date
Dec 22, 2025
Due Date
Jan 6, 2026
Release: Dec 22, 2025
Close: Jan 6, 2026
HUB Reconfiguration.
Posted Date
Dec 19, 2025
Due Date
Jan 13, 2026
Release: Dec 19, 2025
Close: Jan 13, 2026
HUB Reconfiguration.
AvailableCampus reconfiguration & upgrades.
Posted Date
Dec 23, 2025
Due Date
Jan 20, 2026
Release: Dec 23, 2025
Close: Jan 20, 2026
Campus reconfiguration & upgrades.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
AATTC South Trailer Reconfiguration project including updating an existing room into a network access café by installing three new quad network access ports, relocating the existing network cabinet, providing an external raceway system with network-appropriate CAT6 cabling, re-directing in-floor power, and reconfiguring existing door access to select doors, installation of a continuous exterior-rated vapor barrier behind skirting, insulation of piping under trailers and heat tape for sewer lines, installation of a lockable access panel, sealing of the building envelope where needed, and placement of a new awning over the exposed entry door with reuse of existing components where feasible. Additionally, prepare North trailers for removal, structural inspection and repairs to the existing decking that joined North and South trailer groups, construction of new guardrail and stairs on decking, removal of cameras and low-voltage wiring from North trailers, removal of North trailer skirting and lockable access panel.
Available