Summary
The work consists of improving ramps, sidewalks and driveways to comply with ada requirements. The work includes curb, curb and gutter, driveway, sidewalk ramp, and sidewalk replacement, pavement marking, and other related work. Includes 1,198 LF of removal of concrete curb and gutter; 5,763 SF of removal of concrete sidewalks, driveways and slabs; 505 SY of removal of asphaltic concrete pavement; 246 ton of asphaltic concrete (miscellaneous structural) (special mix); 9,768 LF of pavement marking, preformed, white stripe, type iv; 1,200 LF of dual component pavement marking (white epoxy); see attached files.