Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The New York State Office of Parks, Recreation and Historic Preservation (OPRHP) is soliciting contractors to perform concrete, steel, and expansion joint repairs, plus work zone traffic control, on the existing bridge over the Lake Sebago Dam at Harriman State Park in Ramapo, Rockland County, NY. The solicitation includes a base bid engineer’s estimate between approximately $2.24M and $3.03M with an alternate estimate near $238K–$322K, and requires completion within 240 days after NYS Comptroller approval, substantially complete by October 15, 2026. Bids were posted on 2026-01-22 and are due on 2026-02-19, so the opportunity is open as of 2026-01-23.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide mammoth lake dam outlet works sluice gate repairs; dam safety diving inspection twin lakes upper dam; dam safety diving inspection twin lakes lower dam; dam safety diving inspection acme dam.
Posted Date
Jan 5, 2026
Due Date
Jan 27, 2026
Release: Jan 5, 2026
Close: Jan 27, 2026
Provide mammoth lake dam outlet works sluice gate repairs; dam safety diving inspection twin lakes upper dam; dam safety diving inspection twin lakes lower dam; dam safety diving inspection acme dam.
AvailablePark lake dam rehabilitation. Work includes but is not limited to; clearing and grubbing, dewatering of Park Lake, deconstruction of the existing dam, construction of a new dam, new seismic foundation, hydraulic seepage control, road reconstruction, reclamation, and all other work associated with dam rehabilitation and construction.
Posted Date
Jan 15, 2026
Due Date
Feb 16, 2026
Release: Jan 15, 2026
Close: Feb 16, 2026
Park lake dam rehabilitation. Work includes but is not limited to; clearing and grubbing, dewatering of Park Lake, deconstruction of the existing dam, construction of a new dam, new seismic foundation, hydraulic seepage control, road reconstruction, reclamation, and all other work associated with dam rehabilitation and construction.
The USDA Forest Service (Helena-Lewis and Clark National Forest) issued RFQ 1240LU26Q0013 for rehabilitation of Park Lake Dam in Clancy, MT, seeking contractors to perform clearing and grubbing, dewatering, deconstruction of the existing dam, construction of a new dam including seismic foundation improvements and hydraulic seepage control, road reconstruction, and reclamation to be completed over two field seasons. The procurement is a Total Small Business set-aside (NAICS 237990) with an estimated magnitude of construction between $1,000,000 and $5,000,000, requires a 20% bid/offer guarantee, Davis-Bacon wage determinations, and a mandatory site visit; dewatering must commence after July 15 of the first construction year. Offers are due Feb 16, 2026 at 16:00 MST (2026-02-16T23:00:00Z) and the official solicitation and notices are posted on SAM.gov.
Posted Date
Jan 15, 2026
Due Date
Feb 16, 2026
Release: Jan 15, 2026
This solicitation (RFQ 1240LU26Q0013) seeks contractors to rehabilitate the Park Lake Dam on the Helena Ranger District, including demolition of the existing dam and construction of a new seismic foundation, hydraulic seepage control, road reconstruction, and outlet works. The project is magnitude of construction $1,000,000â$5,000,000 and requires a 20% bid bond and compliance measures (noxious weed seed-free materials, fire and hazardous spill plans). The solicitation is a combined synopsis/solicitation issued by the U.S. Department of Agriculture, Forest Service, and is active with attachments (plans, SOW, specifications) posted.
Posted Date
Jan 15, 2026
Due Date
Feb 16, 2026
Release: Jan 15, 2026
Close: Feb 16, 2026
This solicitation (RFQ 1240LU26Q0013) seeks contractors to rehabilitate the Park Lake Dam on the Helena Ranger District, including demolition of the existing dam and construction of a new seismic foundation, hydraulic seepage control, road reconstruction, and outlet works. The project is magnitude of construction $1,000,000â$5,000,000 and requires a 20% bid bond and compliance measures (noxious weed seed-free materials, fire and hazardous spill plans). The solicitation is a combined synopsis/solicitation issued by the U.S. Department of Agriculture, Forest Service, and is active with attachments (plans, SOW, specifications) posted.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The USDA Forest Service (Helena-Lewis and Clark National Forest) issued RFQ 1240LU26Q0013 for rehabilitation of Park Lake Dam in Clancy, MT, seeking contractors to perform clearing and grubbing, dewatering, deconstruction of the existing dam, construction of a new dam including seismic foundation improvements and hydraulic seepage control, road reconstruction, and reclamation to be completed over two field seasons. The procurement is a Total Small Business set-aside (NAICS 237990) with an estimated magnitude of construction between $1,000,000 and $5,000,000, requires a 20% bid/offer guarantee, Davis-Bacon wage determinations, and a mandatory site visit; dewatering must commence after July 15 of the first construction year. Offers are due Feb 16, 2026 at 16:00 MST (2026-02-16T23:00:00Z) and the official solicitation and notices are posted on SAM.gov.
Available