Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes grading.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Contract bp-606 electrical work.
Posted Date
Dec 18, 2025
Due Date
Jan 26, 2026
Release: Dec 18, 2025
Close: Jan 26, 2026
Contract bp-606 electrical work.
AvailablePremium
Access the largest public sector contact database
Work consists of grading, installing storm drainage, and placing asphalt concrete.
Posted Date
Dec 9, 2025
Due Date
Jan 15, 2026
Release: Dec 9, 2025
Close: Jan 15, 2026
Work consists of grading, installing storm drainage, and placing asphalt concrete.
AvailableWork consists of grading, installing storm drainage, and placing asphalt concrete.
Posted Date
Dec 9, 2025
Due Date
Jan 15, 2026
Release: Dec 9, 2025
Close: Jan 15, 2026
Work consists of grading, installing storm drainage, and placing asphalt concrete.
AvailableProvide clearing and re-grading of an approx. 5.5-acre piece of land on the east side of the airport. The scope of this work includes replacing existing stormwater conveyance ditches within this tract of land with large diameter RCP storm pipe, and grading the land to drain towards installed storm sewer inlets and the existing culvert under east side road on the east end of the project site. The project includes selective tree clearing, erosion control, grading, storm sewer installation, and fine grading to provide the designed finished grades. The storm sewer system includes custom- designed concrete junction boxes and a custom-designed end wall at the outlet of the proposed storm sewer. An additional pipe for stormwater detention will also be installed with an outlet control structure.
Posted Date
Oct 30, 2025
Due Date
Jan 6, 2026
Release: Oct 30, 2025
Close: Jan 6, 2026
Provide clearing and re-grading of an approx. 5.5-acre piece of land on the east side of the airport. The scope of this work includes replacing existing stormwater conveyance ditches within this tract of land with large diameter RCP storm pipe, and grading the land to drain towards installed storm sewer inlets and the existing culvert under east side road on the east end of the project site. The project includes selective tree clearing, erosion control, grading, storm sewer installation, and fine grading to provide the designed finished grades. The storm sewer system includes custom- designed concrete junction boxes and a custom-designed end wall at the outlet of the proposed storm sewer. An additional pipe for stormwater detention will also be installed with an outlet control structure.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis