Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Approx. 1 LS Clearing and grubbing; 275 CY unclassified excavation; 311 CY type A-salvaged topsoil; 2,489 SY solid slab sodding; 2,556 SY 4" concrete sidewalk; 36 LF 42" corr. galv. Steel pipe; 1,027 LF sawing pavement; 17 SF sheet aluminum signs; project length = 0.845 mi. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
1 LS clearing and grubbing; 1,317 CY unclassified excavation; 4,807 SY solid slab sodding; 114 SY full depth PCC patch (placement); 1,457 SY of 5" conc sidewalk; 253 LF of 28" X 18" RC pipe arch, cl A-III; 241 SF sheet aluminum signs; 10 SD port changeable message sign. Project length = 1.18 miles. See attached file.
Posted Date
Dec 17, 2025
Due Date
Jan 15, 2026
Release: Dec 17, 2025
Close: Jan 15, 2026
1 LS clearing and grubbing; 1,317 CY unclassified excavation; 4,807 SY solid slab sodding; 114 SY full depth PCC patch (placement); 1,457 SY of 5" conc sidewalk; 253 LF of 28" X 18" RC pipe arch, cl A-III; 241 SF sheet aluminum signs; 10 SD port changeable message sign. Project length = 1.18 miles. See attached file.
AvailablePedestrian/ bike facilities greenbrier ADA ramps.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Pedestrian/ bike facilities greenbrier ADA ramps.
AvailableBike and pedestrian facilities - excavation, stormwater, compacted aggregate, asphalt milling, asphalt for tack coat, chain link fence, concrete sidewalk, manhole adjusting, signs and pavement marking.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
Bike and pedestrian facilities - excavation, stormwater, compacted aggregate, asphalt milling, asphalt for tack coat, chain link fence, concrete sidewalk, manhole adjusting, signs and pavement marking.
AvailablePedestrian/ Bike Facilities Salem Sidewalks Phase I Sidewalk.
Posted Date
Dec 4, 2025
Due Date
Jan 13, 2026
Release: Dec 4, 2025
Close: Jan 13, 2026
Pedestrian/ Bike Facilities Salem Sidewalks Phase I Sidewalk.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis