Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the following Work: The installation of approx. 6,680 LF of 8" waterline by horizontal directional bore and open cut including all appurtenances, installation of a hydropneumatics tank, connection to the existing water- lines and miscellaneous piping.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project consists of waterline extension.
Posted Date
Jan 25, 2026
Due Date
Feb 2, 2026
Release: Jan 25, 2026
Close: Feb 2, 2026
Project consists of waterline extension.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes Base Project includes approx 3,115 LF of 12″ AWWA C906 DR13.5 Waterline 823 LF of 8″ AWWA C906 DR13.5 Waterline Project includes approx : 690 LF of 10″ AWWA C906 DR13.5 Waterline.
Posted Date
Jan 22, 2026
Due Date
Feb 18, 2026
Release: Jan 22, 2026
Close: Feb 18, 2026
Work includes Base Project includes approx 3,115 LF of 12″ AWWA C906 DR13.5 Waterline 823 LF of 8″ AWWA C906 DR13.5 Waterline Project includes approx : 690 LF of 10″ AWWA C906 DR13.5 Waterline.
AvailableWork includes 1900 LF, furnish and install reinforced filter fabric barrier, complete in place; 112 SY, furnish and install stabilized construction access, complete in place; 803 LF, site restoration; 803 LF, furnish and install trench safety system for water line construction, complete in place; 596 LF, furnish and install 12IN dia. waterline by open cut, including all bends, fittings, valves, and appurtenances, complete in place; 167 LF, furnish and install 12 IN dia. waterline by open cut with restrained joints including all bends, fittings, valves, and appurtenances, complete in place; 120 LF, 12 IN dia. fusible PVC pipe waterline in 24 IN HDPE casing by trenchless construction, including all bends, fittings, complete in place. See attached files.
Posted Date
Jan 7, 2026
Due Date
Jan 28, 2026
Release: Jan 7, 2026
Close: Jan 28, 2026
Work includes 1900 LF, furnish and install reinforced filter fabric barrier, complete in place; 112 SY, furnish and install stabilized construction access, complete in place; 803 LF, site restoration; 803 LF, furnish and install trench safety system for water line construction, complete in place; 596 LF, furnish and install 12IN dia. waterline by open cut, including all bends, fittings, valves, and appurtenances, complete in place; 167 LF, furnish and install 12 IN dia. waterline by open cut with restrained joints including all bends, fittings, valves, and appurtenances, complete in place; 120 LF, 12 IN dia. fusible PVC pipe waterline in 24 IN HDPE casing by trenchless construction, including all bends, fittings, complete in place. See attached files.
AvailableInstallation of approximately 11,400 feet of 8" and 16" PVC waterline and 10,300 feet of 12" PVC sanitary sewer.
Posted Date
Jan 2, 2026
Due Date
Feb 5, 2026
Release: Jan 2, 2026
Close: Feb 5, 2026
Installation of approximately 11,400 feet of 8" and 16" PVC waterline and 10,300 feet of 12" PVC sanitary sewer.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →